As Per TDS
SDRIDP/ASSA/VR-49 Part-1: Improvement of Aarar Makka Pukur - H/O.- Sobahan Gazi in Aarar Road by BC at Ch: 00-1070m (Road ID-287045094) under Assasuni Upazila, Dist: Satkhira. (Effective Length = 1070m) Part-2: Improvement of Aarar Gobindapur GPS - Aarar Shwashanghat Road by BC at Ch: 00-1310m (Road ID-287045095) under Assasuni Upazila, Dist: Satkhira. (Effective Length = 1310m) Part-3: Improvement of Kachua Paschim Ghospara - Eyetala via Mahajanpur Road by BC at Ch: 00-1555m (Road ID-287044127) under Assasuni Upazila, Dist: Satkhira. (Effective Length = 1555m) Part-4: Improvement of Purohitpur Goshpara-Kachua Sheikpara Road by BC at Ch: 00-370m (Road ID-287045135) under Assasuni Upazila, Dist: Satkhira. (Effective Length = 370m) (Total Effective Length = 4305m) Salvaged Material Cost BDT. 3417987.00