As Per TDS.
Construction of RCC Palisading and Installation at Ch.03+690 km to Ch.03+750 km (R/S), Ch.03+810 Km to Ch.03+850 Km (R/S) & Ch. 05+700 km to Ch. 05+760 km (R/S), Ch.06+400 Km to Ch.06+445 Km (R/S) & Ch. 06+940 km to Ch. 06+995 km (R/S), of Goalando(Jamtala)-Godarbazar-Pangsha-Habaspur Road (Z-7106) Road under Road Division Rajbari during the FY 2026-2027.