| Brief Description of Works : |
MCC/DPP/03/PW-102.B
R-887: Development of Kistopur Road by RCC Pavment with RCC Drain in Ward No. 17(Remaining Portion),R-888: Development of road from Baghmara Rail crossing to Alia Madrasha Road by RCC Pavement in Ward No.18 (Remaining Portion), R-889: Construction of RCC Road from Eshani pukur par to Kalibari main road vai Atani pukur par in Ward No.18(Remaining portion), R-895: Construction of RCC Road starting from JC Guho Road charal er basa to Food Godown in Ward No. 18, R-897:Construction of CC Road from J.C Guho Road Hafij Uddin Master to Mozammel Master's House in Ward No.18, R-898:Construction of CC Road with RCC Drain from J.C guho road Sirjul house to west side's Sahadat House in word no-18. R-899: Construction of CC Road with RCC Drain from Bapari bari Sibli house to Doulot munshi Road in Ward No.18, R-900: Part-A: Development of Road with extension by BC from RHD Road near Shamvugonj Bridge to Thana Ghat Road in Ward No.18,R-900: Part-B: Construction of RCC Palisading in different chainages from RHD Road near Shamvugong bridge to Thana Ghat Road in Ward No. 18,R-901: Construction of RCC Road from Bapari bari Moinul Tuhin house to Doulot munshi road in ward no-18 ,(Part-a and b), D-909: Construction of RCC Drain from Eshani pukur par to Kalibari main road via Atani pukur par in Ward No.18(Remaining Portion), D-911: Construction of RCC Drain from Medical gate to Food Godown near JC Guho Road in Ward No.18,D-914: Construction of RCC Drain from Bepari bari Moinul-tuhin house to Bihari camp in Ward No.18, D-915: Construction of RCC Drain at Atani pukur par bylane in Ward No.18.(Pocket Slab=59 nos)(Remaining Portion), D-916 Construction of RCC Drain in Kistopur rail gate to Sweeper Colony in Ward No.18(Remaining Portion),D-971:Construction of RCC Drain from Bolashpur Moddhopara to Shikery Khanda Khal in Ward No.19
|