| Brief Description of Works : |
CIDP/Murad/2026-27/W-26 Part-A: Improvement of Bagaimuri - Bailabari GPS Road at Ch: 00-550m (Road ID: 419815266) (Salvage Cost Tk. 4,08,797/-), (i) Earth Work (1029.037cum), (ii) Road Work (550m), (iii) Construction of 139m Protective Work on the same road, (iv) Road Safety Work (500m), Part-B: Improvement of Baira Shafiq Chairman House-Anantapur Road at Ch: 00-840m (Road ID: 419815392) (Salvage Cost Tk.5,55,725/-), (i) Earth Work (1992.100cum), (ii) Road Work (840m), (iii) Construction of 0.90x0.90m U-Drain at Ch; 760m on the same road, (iv) Construction of 171m Protective Work on the same road, (iv) Road Safety Work (840m), Part-C: Improvement of Haydrabad Tazu Fakir bari to Shahid membar house Road at Ch: 00-800m (Road ID: 419815014) , (i) Earth Work (1415.467cum), (ii) Road Work (800m), (iii) Construction of 126m Protective Work on the same road, (iv) Road Safety Work (800m), Part-D: Improvement of Baila Bari - Tonki Road at Ch: 00-1000m (Road ID: 419815267) (Salvage Cost Tk.7,01,428/-), (i) Earth Work (2442.850cum), (ii) Road Work (1000m), (iii) Construction of 0.90x0.90m U-Drain at Ch; 597m on the same road, (iv) Construction of 99m Protective Work on the same road, (iv) Road Safety Work (1000m) under Muradnagar Upazila, District: Cumilla.
|