As Per TDS.
Construction of RCC Palisading and Installation with earth work at Ch.00+200 km to Ch.00+210 km (R/S), Ch.00+600 Km to Ch.00+650 Km (L/S) ,Ch. 01+810 km to Ch. 01+840 km (R/S), Ch.02+050 Km to Ch.02+070 Km (L/S), Ch. 02+310 km to Ch. 02+325 km (R/S), Ch.02+500 km to Ch.02+550 km (R/S), Ch.02+900 Km to Ch.02+930 Km (R/S) Ch.02+990 km to Ch.03+000 km (L/S), Ch.03+900 Km to Ch.03+920 Km (R/S),Ch. 03+928 km to Ch. 03+948 km (L/S) & Ch.05+712 Km to Ch.05+720 Km (L/S) of Goalando-Faridpur-Tarail (Z-7108) Road under Rajbari Road Division during the year 2026-2027.