As per TDS
Reconstruction of Sukhanpukur station yard Loop line No-1 by MG PSC sleeper and 75 lb "R" rail instead of existing 60 lb Rail and Wooden Sleeper with sleeper density=N+5 in SSAE/WAY/Bogura Section under Divisional Engineer, Lalmonirhat Jurisdiction. Total Length=0.670 K.M