As per TDS
Reconstruction of Kamarpara station yard Loop line No-2 by MG PSC sleeper and 75 lb "R" rail instead of existing 60 lb Rail and Wooden Sleeper with sleeper density=N+5 in SSAE/WAY/Bamondanga Section under Divisional Engineer, Lalmonirhat Jurisdiction. Total Length=0.784 K.M