View IFT /PQ / REOI / RFP / PPS Notice Details
Ministry : Ministry of Energy, Power and Mineral Resources Division : Power Division
Organization : Ashuganj Power Station Company Ltd. Procuring Entity Name : Procurement Division
Procuring Entity Code : Procuring Entity District : Brahmanbaria
Procurement Nature : Goods Procurement Type : ICT
Event Type : Invitation for : Tender - Single Lot
Invitation Reference No. : 27.25.1233.000.301.07.0001.23.1070; 14/10/2026 Tender/Proposal Status :
App ID : 228388 Tender/Proposal ID : 1352580
Key Information and Funding Information :
Procurement Method : Open Tendering Method (OTM) Budget Type : Own Fund
Source of Funds : Own Fund
Particular Information :
Project Code : Not applicable Project Name : Not applicable
Tender/Proposal Package No. and Description : GRFMGTS-002
Procurement of Spare Parts for the Gas Booster Compressor of Ashuganj 450 MW CCPP (South), Zone-B, APSCL.
Category : Machinery, equipment, appliances, apparatus and associated products;Machinery for the production and use of mechanical power;Turbines and motors;Pumps and compressors;Taps, cocks, valves and similar appliances;Gears, gearing and driving elements;General-purpose machinery;Industrial or laboratory furnaces, incinerators and ovens;Lifting and handling equipment and parts;Cooling and ventilation equipment;Miscellaneous general-purpose machinery;Agricultural, horticultural and forestry machinery;Agricultural and forestry machinery for soil preparation or cultivation;Harvesting machinery;Spraying machinery for agriculture or horticulture;Self-loading or unloading trailers and semi-trailers for agriculture;Specialist agricultural or forestry machinery;Tractors;Parts of agricultural and forestry machinery;Machine tools;Machine tools operated by laser and machining centres;Lathes, boring and milling machine tools;Metal-working machine tools;Machine tools for working hard materials except metals;Pneumatic or motorised hand tools;Soldering, brazing and welding tools, surface tempering and hot-spraying machines and equipment;Parts and accessories of machine tools;Special-purpose machinery and parts;Machinery for metallurgy and associated parts;Machinery for mining, quarrying and construction;Machinery for food, beverage and tobacco processing and associated parts;Machinery for textile, apparel and leather production;Machinery for paper or paperboard production;Miscellaneous special-purpose machinery;Weapons, ammunition and associated parts;Motorised tanks and armoured fighting vehicles;Military weapons;Firearms;Ammunition;Parts of military weapons;Truncheons or night sticks;Domestic appliances;Electrical domestic appliances;Non-electric domestic appliances;Miscellaneous equipment;Transport related equipment;Workshop equipment;Construction equipment;Catering equipment;Emergency and security equipment;Technical equipment;Miscellaneous equipment n.e.c.
Scheduled Tender/Proposal Publication
Date and Time :
14-Oct-2026 14:00 Tender/Proposal Document last selling /
downloading Date and Time :
01-Dec-2026 18:00
Pre - Tender/Proposal meeting Start
Date and Time :
14-Oct-2026 15:00 Pre - Tender/Proposal meeting End
Date and Time :
14-Oct-2026 16:00
Tender/Proposal Closing
Date and Time :
02-Dec-2026 16:00 Tender/Proposal Opening
Date and Time :
02-Dec-2026 16:00
Last Date and Time for Tender/Proposal Security
Submission :
02-Dec-2026 15:30    
Information for Tenderer/Consultant :
Eligibility of Tenderer :

a) The tenderer shall have all legal documents such as Updated Trade License, Latest Income Tax Clearance certificate or Acknowledgement of Income Tax Return slip, VAT Registration Certificate etc.

b) The tenderer shall have experience, financial solvency and fulfillment of the technical specification etc. as required in the Tender Document.

c) After accomplishing the tender opening process. If TEC is unable to download the important documents of the tender/s which consequently affects the tender evaluation process or creates ambiguity; then, TEC may treat the said tender/s as non-responsive.

Brief Description of Goods and Related Service :

Procurement of Spare Parts for the Gas Booster Compressor of Ashuganj 450 MW CCPP (South), Zone-B, APSCL.

Evaluation Type : Lot wise
Document Available : Package wise
Document Fees : Package wise
Tender/Proposal Document Price (In BDT) : 12000
Mode of Payment :
Tender/Proposal Security Valid Up to : 29-Apr-2027
Tender/Proposal Valid Up to : 01-Apr-2027
Lot No. Identification of Lot Location Tender/Proposal Security (Amount in BDT) Tender/Proposal Security (Amount in USD) Tentative Start Date Tentative Completion Date
1 Procurement of Spare Parts for the Gas Booster Compressor of Ashuganj 450 MW CCPP (South), Zone-B, APSCL. Ashuganj 450MW Store of South, Zone -B of APSCL, Ashuganj, Brahmanbaria. 3300000 23900 01-Feb-2027 31-Jan-2028
Procuring Entity Details:
Name of Official Inviting Tender/Proposal : Md. Rafiquddaulla Designation of Official Inviting Tender/Proposal : DGM (PROC)
Address of Official Inviting Tender/Proposal :
Address: Ashuganj Power Station Company Ltd., Ashuganj, Brahmanbaria-3402
City: Ashuganj
Thana: Ashuganj
District: Brahmanbaria - 3402
Country: Bangladesh
Contact details of Official Inviting Tender/Proposal :
Phone No: 08528-74033
Fax No: 08528-74044
The procuring entity reserves the right to accept or reject all Tenders/Proposals / Pre-Qualifications / EOIs
Note: Bank will update the payment transactions only at the end of the day, so the tenderers should make sure the securities and other payments are made at least one day before the submission date.
Documents
Amendment / Corrigendum Detail
 Amendment / Corrigendum No. :  1 
Amendment / Corrigendum Text :

Amendment regarding Taxes and Duties in tender document.

Field Name Old Value New Value
Eligibility of Consultant

a) The tenderer shall have all legal documents such as Updated Trade License, Latest Income Tax Clearance certificate or Acknowledgement of Income Tax Return slip, VAT Registration Certificate etc.

b) The tenderer shall have experience, financial solvency and fulfillment of the technical specification etc. as required in the Tender Document.

c) After accomplishing the tender opening process. If TEC is unable to download the important documents of the tender/s which consequently affects the tender evaluation process or creates ambiguity; then, TEC may treat the said tender/s as non-responsive.

a) The tenderer shall have all legal documents such as Updated Trade License, Latest Income Tax Clearance certificate or Acknowledgement of Income Tax Return slip, VAT Registration Certificate etc.

b) The tenderer shall have experience, financial solvency and fulfillment of the technical specification etc. as required in the Tender Document.

c) After accomplishing the tender opening process. If TEC is unable to download the important documents of the tender/s which consequently affects the tender evaluation process or creates ambiguity; then, TEC may treat the said tender/s as non-responsive.

PCC-----

Payment for Goods supplied from abroad:
Payment of foreign currency portion shall be made in [currency of the Contract Price] in the following manner:

(a) Advance Payment: Not Applicable.

(b) On Shipment:

Seventy (70) percent of the Contract Price of the Goods shipped shall be paid through irrevocable letter of credit opened in favour of the Supplier in a bank in its country, upon submission of documents specified in GCC Clause 21.

(c) On Delivery and Acceptance:
Twenty (20) percent payment of the Goods received shall be paid after successfully supplying of goods, issuing of Receipt & Inspection (R&I) report upon submission of claim and approval of competent authority of APSCL.

One hundred percent (100%) of the inland transportation and other local delivery costs shall be paid against a claim bill duly certified by the work-in-charge, supported by the Receipt & Inspection (R&I) Report of the Goods after successful delivery to APSCL’s Store, and upon approval by the competent authority of APSCL.

(d) Banking Charges:
(i) The L/C charges of the L/C opening bank shall be borne by APSCL, while the L/C charges of the Supplier’s bank shall be borne by the Supplier.
(ii) The supplier shall have to bear all such charges both inside and outside Bangladesh in case of extension of L/C if done at the request of the supplier.

If any item(s) fail to pass the inspection mentioned in PCC clause 32.1 or do not conform to the specifications stated in Technical Specifications and Compliance of Goods and related services (Form e-PG4-5), 100% value of the particular item(s) shall be withheld from the remaining 30% invoice value of total contract until the Supplier either rectifies or replaces such rejected Goods or parts thereof or makes alterations necessary to meet the specifications.

(e) Retention Money:
Procuring Entity shall deduct from each payment a retention amount of 10% to cover the defect liability period (warranty period). The total retention amount shall be disbursed within 28 days after completion of Warranty period.

Payment for Goods and Services supplied from within the Bangladesh: Not Applicable.

Payment for Goods supplied from abroad:
Payment of foreign currency portion shall be made in [currency of the Contract Price] in the following manner:

(a) Advance Payment: Not Applicable.

(b) On Shipment:

Seventy (70) percent of the Contract Price of the Goods shipped shall be paid through irrevocable letter of credit opened in favour of the Supplier in a bank in its country, upon submission of documents specified in GCC Clause 21.

(c) On Delivery and Acceptance:
Twenty (20) percent payment of the Goods received shall be paid after successfully supplying of goods, issuing of Receipt & Inspection (R&I) report upon submission of claim and approval of competent authority of APSCL.

One hundred percent (100%) of the inland transportation and other local delivery costs shall be paid against a claim bill duly certified by the work-in-charge, supported by the Receipt & Inspection (R&I) Report of the Goods after successful delivery to APSCL’s Store, and upon approval by the competent authority of APSCL.

(d) Banking Charges:
(i) The L/C charges of the L/C opening bank shall be borne by APSCL, while the L/C charges of the Supplier’s bank shall be borne by the Supplier.
(ii) The supplier shall have to bear all such charges both inside and outside Bangladesh in case of extension of L/C if done at the request of the supplier.

If any item(s) fail to pass the inspection mentioned in PCC clause 32.1 or do not conform to the specifications stated in Technical Specifications and Compliance of Goods and related services (Form e-PG4-5), 100% value of the particular item(s) shall be withheld from the remaining 30% invoice value of total contract until the Supplier either rectifies or replaces such rejected Goods or parts thereof or makes alterations necessary to meet the specifications.

(e) Retention Money:
Procuring Entity shall deduct from each payment a retention amount of 10% to cover the defect liability period (warranty period). The total retention amount shall be disbursed within 28 days after completion of Warranty period.

Payment for Goods and Services supplied from within the Bangladesh: Not Applicable.

 

 

N.B.:

Additional Clause 1:

GCC Clause 27.1 wil be modified as

a)Taxes and Duties Outside Bangladesh

The Supplier shall be fully responsible for all applicable taxes, customs duties, VAT, license fees, and other levies imposed or incurred outside Bangladesh.

b) Bangladesh Income tax and VAT for Income Earned in Bangladesh

The Supplier shall be entirely liable to pay all Income Tax, VAT and all other taxes of similar nature earned in Bangladesh arising out of this contract for both Foreign currency (if any other than CIP Value) & Local currency portion [i.e. except CIP value] of the Contract Price at the prevailing rule of the Government (at the date of Tender Submission) which shall be deducted at source during payment of bills for onward deposition of the same into Government Treasury. At the date of payment if there is any increase or decrease in rate of Income tax, VAT and other taxes, APSCL will pay or receive respectively the balance amount.

But for payment through Local L/C, Supplier shall be entirely responsible to pay all Income Tax and other taxes (if any) as per existing laws/rules of Bangladesh Government and these will be deducted at source.

c) Import related duties, taxes, VAT, levies

APSCL will be responsible for the payment of import related duties, taxes, VAT, levies and all sort of charges etc. to be liable by the port as well as other Govt. agencies inside Bangladesh for the goods to be imported in accordance with the specification. But APSCL shall not pay the custom duty on any replacement/ additional items.

Brief Description of Goods,Works or Service

Procurement of Spare Parts for the Gas Booster Compressor of Ashuganj 450 MW CCPP (South), Zone-B, APSCL.

Procurement of Spare Parts for the Gas Booster Compressor of Ashuganj 450 MW CCPP (South), Zone-B, APSCL.

 