| Eligibility of Consultant
|
1. NID Card of Tenderer.
2. Updated Trade License.
3. TIN Certificate & Income Tax Clearance Certificate for 2025-2026 Financial Year.
4. VAT registration Certificate.
5. Authorization letter.
6. The tender will be evaluated as per submitted documents. If any dissimilarity found in documents submitted by tenderers at any stage of evaluation process, the tenderers will be considered non-Responsive.
7. If a quoted price is submitted at a rate excessively lower than the official estimated cost and appears to the TEC to be unrealistic and submitted with ulterior motives, it will be considered as an attempt to influence the tender evaluation process according to rule 42(2) PPR 2025. According to rule 149(2)(c) such act will be considered as 'conspiratorial act and shall take necessary actions against if following rule 149, PPR 2025. [Ref: 21.00.0000.363.27.114(4).25-26, Date: 04/05/2026.]
8. If corrupt, fraudulent, collusive, coercive or obstructive practices of any kind are determined against any tenderer, then measures shall be taken as per ITT clause 4 of Standard Tender Document.
9. Subject to the fulfillment of all conditions, the authority will accept the winning bidder's tender through the e-GP SLT process and reserves the right to cancel the tender following rules of PPR-2025.
10. Should any objection regarding recoverable amounts be raised by a government audit—either during or after the tenure of the appointed contracting—the concerned firm shall bear the liability associated with such an objection.
11. Any other rules described in PPR-2025 and STD.
|
1. NID Card of Tenderer.
2. Updated Trade License.
3. TIN Certificate & Income Tax Clearance Certificate for 2025-2026 Financial Year.
4. VAT registration Certificate.
5. Authorization letter.
6. The tender will be evaluated as per submitted documents. If any dissimilarity found in documents submitted by tenderers at any stage of evaluation process, the tenderers will be considered non-Responsive.
7. If a quoted price is submitted at a rate excessively lower than the official estimated cost and appears to the TEC to be unrealistic and submitted with ulterior motives, it will be considered as an attempt to influence the tender evaluation process according to rule 42(2) PPR 2025. According to rule 149(2)(c) such act will be considered as 'conspiratorial act and shall take necessary actions against if following rule 149, PPR 2025. [Ref: 21.00.0000.363.27.114(4).25-26, Date: 04/05/2026.]
8. If corrupt, fraudulent, collusive, coercive or obstructive practices of any kind are determined against any tenderer, then measures shall be taken as per ITT clause 4 of Standard Tender Document.
9. Subject to the fulfillment of all conditions, the authority will accept the winning bidder's tender through the e-GP SLT process and reserves the right to cancel the tender following rules of PPR-2025.
10. Should any objection regarding recoverable amounts be raised by a government audit—either during or after the tenure of the appointed contracting—the concerned firm shall bear the liability associated with such an objection.
11. Any other rules described in PPR-2025 and STD.
12. Tenderers shall have the following up to date valid License: Valid trade, TIN, BIN, ABC/BC/C contractory and suparvisory licence required.
|
| TDS/PDS--D. Tender Preparation--
|
Tenderers shall submit with its Tender the following additional documents:
1. NID Card of Tenderer.
2. Updated Trade License.
3. TIN Certificate & Income Tax Clearance Certificate for 2025-2026 Financial Year.
4. VAT registration Certificate.
5. Authorisation Latter.
6. Bank statment of last 3 months with continuous Transaction and the total transaction should be not less than Tk 10.60 lakh.
7. Reputed contractors/construction firms who have minimum 3 (Three) years of general experience in Construction works/Building Repair Management.
8. Having experience in successfully completion/execution of at least 1 (one) number of similar nature of work worth not less than Tk. Tk 10.60 Lac only in a single work order in Government/ Semi Government/Autonomous Organization of Bangladesh during last 3 (Three) years.
9. The required average annual construction turnover shall be greater than Tk 14.80 Lac during the last [3 (Three)] years, Payment certificates of work contract in progress or completed under public sector must be submitted along with tender in support of average annual construction turnover.
10. The minimum amount of Liquid Assets l.e. working capital or credit Line(s) of the tenderer shall be Tk 10.60 Lac only, supported by Bank certificate (Form e-PW2A-8).
11. Tender security as per TDS.
12. The tender will be evaluated as per submitted documents. If any dissimilarity found in documents submitted by tenderers at any stage of evaluation process, the tenderers will be considered non-Responsive.
13. If a quoted price is submitted at a rate excessively lower than the official estimated cost and appears to the TEC to be unrealistic and submitted with ulterior motives, it will be considered as an attempt to influence the tender evaluation process according to rule 42(2) PPR 2025. According to rule 149(2)(c) such act will be considered as 'conspiratorial act and shall take necessary actions against if following rule 149, PPR 2025. [Ref: 21.00.0000.363.27.114(4).25-26, Date: 04/05/2026.]
14. If corrupt, fraudulent, collusive, coercive or obstructive practices of any kind are determined against any tenderer, then measures shall be taken as per ITT clause 4 of Standard Tender Document.
15. Subject to the fulfillment of all conditions, the authority will accept the winning bidder's tender through the e-GP SLT process and reserves the right to cancel the tender following rules of PPR-2025.
16. Should any objection regarding recoverable amounts be raised by a government audit—either during or after the tenure of the appointed contracting—the concerned firm shall bear the liability associated with such an objection.
17. Any other rules described in PPR-2025 and STD.
|
Tenderers shall submit with its Tender the following additional documents:
1. NID Card of Tenderer.
2. Updated Trade License.
3. TIN Certificate & Income Tax Clearance Certificate for 2025-2026 Financial Year.
4. VAT registration Certificate.
5. Authorisation Latter.
6. Bank statment of last 3 months with continuous Transaction and the total transaction should be not less than Tk 10.60 lakh.
7. Reputed contractors/construction firms who have minimum 3 (Three) years of general experience in Construction works/Building Repair Management.
8. Having experience in successfully completion/execution of at least 1 (one) number of similar nature of work worth not less than Tk. Tk 10.60 Lac only in a single work order in Government/ Semi Government/Autonomous Organization of Bangladesh during last 3 (Three) years.
9. The required average annual construction turnover shall be greater than Tk 14.80 Lac during the last [3 (Three)] years, Payment certificates of work contract in progress or completed under public sector must be submitted along with tender in support of average annual construction turnover.
10. The minimum amount of Liquid Assets l.e. working capital or credit Line(s) of the tenderer shall be Tk 10.60 Lac only, supported by Bank certificate (Form e-PW2A-8).
11. Tender security as per TDS.
12. The tender will be evaluated as per submitted documents. If any dissimilarity found in documents submitted by tenderers at any stage of evaluation process, the tenderers will be considered non-Responsive.
13. If a quoted price is submitted at a rate excessively lower than the official estimated cost and appears to the TEC to be unrealistic and submitted with ulterior motives, it will be considered as an attempt to influence the tender evaluation process according to rule 42(2) PPR 2025. According to rule 149(2)(c) such act will be considered as 'conspiratorial act and shall take necessary actions against if following rule 149, PPR 2025. [Ref: 21.00.0000.363.27.114(4).25-26, Date: 04/05/2026.]
14. If corrupt, fraudulent, collusive, coercive or obstructive practices of any kind are determined against any tenderer, then measures shall be taken as per ITT clause 4 of Standard Tender Document.
15. Subject to the fulfillment of all conditions, the authority will accept the winning bidder's tender through the e-GP SLT process and reserves the right to cancel the tender following rules of PPR-2025.
16. Should any objection regarding recoverable amounts be raised by a government audit—either during or after the tenure of the appointed contracting—the concerned firm shall bear the liability associated with such an objection.
17. Any other rules described in PPR-2025 and STD.
18. If the total quoted price is more than 10% (Ten Percent) less or above than the Engineers Estimate, the tenderer shall submit item wise analysis of Rates in support of his quoted rate and if not justify then the tenderer is Technically non responsible. [Follow PPR-2025, rule 118 (25 & 26)
|
| Brief Description of Goods,Works or Service
|
Repair and Renovation work of MT Garage RCC Road under RMP, Rajshahi.
|
Repair and Renovation work of MT Garage RCC Road under RMP, Rajshahi.
|