1. Updated Trade License. 2. Updated TIN Certificate. 3.Updated Tax Return Certificate. 4. BIN Certificate (Mushak-2.3). 5. Documentary evidence of liquid assets / Bank Statement/ Bank Commitment For 120 days (i.e base counting backward from the date of IFT in e-GP System).
6. Site visit report must be submitted; otherwise, it will be taken that, the site has been visited (i.e the position of solar panel, Inverter and others equipments as well as total layout of the solar system to be established).
7. Update ABC Category Electrical Supervisory License from Bangladesh Electrical Licensing Board & As Per TDS.
Renovation work of 400kV Local Control Room (East & West) at Kaliakair 400/230/132 kV Grid Sub-Station under Grid Circle, Dhaka (North), Power Grid Bangladesh PLC.