NWDD/NDR/26-27/W-01
Removal of silt from the bed, removal of garbage, hyacinth, and other obstacles; repair and maintenance for the Secondary Irrigation Canal (SIC-1) km. 0.00 to km. 0.900 = 0.900 km in connection with NNIP Block-A/1 under repair & maintenance Budget of Narayanganj Water Development Division, BWDB, Narayanganj during the FY- 2026-27.