As Per TDS
Construction of RCC U-Drain with slab at Ch.23+165 to 23+300(R/S), Ch.23+165 to 23+214(L/S) of Dhaka (Banani)-Joydebpur-Mymensingh Road (N-3) under Gazipur Road Division during the year 2026-2027.