View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 2
|
|
| Amendment / Corrigendum Text : | Corrigendum for tender notice. |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 24/07/2024 17:00 | 29/07/2024 17:00 |
| Eligibility of Consultant | As stated in the tender document. |
As stated in the tender document. |
| Opening Date & Time | 25/07/2024 12:00 | 30/07/2024 13:00 |
| Last date & time for Tender/Proposal Security Submission | 25/07/2024 11:00 | 30/07/2024 12:00 |
| Closing Date & Time | 25/07/2024 12:00 | 30/07/2024 13:00 |
| Brief Description of Goods,Works or Service | On CD branch line: Construction of bank protection wall at Km. 13/7-9 (Left side) = 650'-0" in between station JNHT-GMDI including repairing cess & bank at Km. 13/7-14/0 with other allied works as per drawing. |
On CD branch line: Construction of bank protection wall at Km. 13/7-9 (Left side) = 650'-0" in between station JNHT-GMDI including repairing cess & bank at Km. 13/7-14/0 with other allied works as per drawing. |
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Corrigendum for tender document. |
| Field Name | Old Value | New Value |
|---|---|---|
| PCC 11. Intended Completion Date11.1 Intended Completion Date | The Intended Completion Date for the whole of the Works shall be 2025-03-03 | The Intended Completion Date for the whole of the Works shall be 2025-05-02 |
| TDS/PDS--C. Qualification Criteria-- | The required average annual construction turnover shall be greater than Tk. 50.00 (Fifty) Lakh over the best 03 (Three) years of the last 05 (Five) years. |
The required average annual construction turnover shall be greater than Tk. 32.00 (Thirty Two) Lakh over the best 03 (Three) years of the last 05 (Five) years. |