As stated in the tender document.
At CGPY-FTJ Section : Construction of Ballast protection wall from Km 2/4-8 Left side = (300+200+320) FFT. Right side = (100+300) RFT. 3/2-7 Left side = (620+320) RFT. Right side = (620+300+250+320) RFT. Km 6/0-2 Right side = 620 RFT. Right side = 430 RFT. Km, 8/0-3 Left side = 320 Rft, Right side = 100 RFT. Total Length (Right side = 2700 RFT. Right side = 2420 RFT) = 5120 RF. As per approved drawing with other allied works.