View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Corrigendum due to unavoidable circumstance
All other terms & conditions will be remain unchanged. |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 31/07/2024 16:00 | 07/08/2024 16:00 |
| Eligibility of Consultant | Qualification Criteria : As per TDS |
Qualification Criteria : As per TDS |
| Opening Date & Time | 01/08/2024 15:00 | 08/08/2024 15:00 |
| Last date & time for Tender/Proposal Security Submission | 01/08/2024 14:00 | 08/08/2024 14:00 |
| Closing Date & Time | 01/08/2024 15:00 | 08/08/2024 15:00 |
| TDS/PDS--C. Qualification Criteria-- | The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor shall be 5 (Five) years.
The minimum specific experience as a Prime Contractor in construction works of at least Tk 230.00 lakh under 01 (One ) contract ( PSC / RCC Girder Bridge work and minimum 20.00m length ) of last five years shall be required [ years counting backward from the date of publication of IFT in the newspaper]. |
The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor shall be 5 (Five) years.
The minimum specific experience as a Prime Contractor in construction works of a nature, complexity and methods/construction technology similar to the proposed at least Tk 230.00 lakh under 01 (One ) contract ( PSC / RCC Girder Bridge work and minimum 20.00m length ) of last five years shall be required [ years counting backward from the date of publication of IFT in the newspaper]. |
| TDS/PDS--D. Tender Preparation-- |
Tenderer shall submit with its Tender, the following additional documents: Earth Work Should be done After starting the works. If the contractors not complete the earth work, the rest item of work will not be started.Bill of earth work will be pay at the time of final bill. The payment retained for uncompleted earth work/or any other item of work is estimated rate (In case of less quoted rate for earth work/ or any other item of work), and the payment retained for uncompleted earth / or any other item of work is qouted rate (In case of above quoted rate for earth work/ or any other item of work). In case of running bill, the payment of front loaded item will be paid using overall above/less rate (official rate plus percentage above/less than the official rate) and the other items which are less than the overall average rate given by the contractor will be paid as per quoted rate i.e.BOQ rate. After successful completion of contract final payment will be made using BOQ rates.
If the contract is terminated for breach of contract the payment will be made as criteria mentioned in case of running bills. * Black stone should be use in case of carpeting and seal coat work. |
Tenderer shall submit with its Tender, the following additional documents: The payment retained for uncompleted earth work/or any other item of work is estimated rate (In case of less quoted rate for earth work/ or any other item of work), and the payment retained for uncompleted earth / or any other item of work is qouted rate (In case of above quoted rate for earth work/ or any other item of work). In case of running bill, the payment of front loaded item will be paid using overall above/less rate (official rate plus percentage above/less than the official rate) and the other items which are less than the overall average rate given by the contractor will be paid as per quoted rate i.e.BOQ rate. After successful completion of contract final payment will be made using BOQ rates.
If the contract is terminated for breach of contract the payment will be made as criteria mentioned in case of running bills. * Black stone should be use in case of carpeting and seal coat work. |
| Brief Description of Goods,Works or Service | GDIRIIP/Kotali/VR-SR/23-24/289 |
GDIRIIP/Kotali/VR-SR/23-24/289 |