| TDS/PDS--C. Qualification Criteria-- | The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 05 years. years counting backward from the date of publication of IFT in the newspaper] The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least one contract(s) of similar nature, complexity and methods/construction technology successfully completed within the last 05 years, each with a value of at least Tk.500000.00
|
The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 05 years. years counting backward from the date of publication of IFT in the newspaper] The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least one contract(s) of similar nature, complexity and methods/construction technology successfully completed within the last 05 years, each with a value of at least Tk.5000000.00 (Fifty Lack)
|
| Brief Description of Goods,Works or Service | Construction of Head teacherâs room with attached toilet of Tal Tala GOVT PRIMARY SCHOOL under PEDP4 Construction of Head teacherâs room with attached toilet of Angikara GOVT PRIMARY SCHOOL under PEDP4. Construction of Head teacherâs room with attached toilet of Razia Khatun Provati GOVT PRIMARY SCHOOL under PEDP4.
ITT 30.1 The required Technical Proposal shall include the following additional information: Revised RDPP of PEDP4 is under approval process, So contact agreement can not be signed before RDPP approval if RDPP (2nd revision) of PEDP4 does not get approval then Tender will be cancelled.
ITT 32.1 The Tender Validity period shall be 180 days |
Construction of Head teacherâs room with attached toilet of Tal Tala GOVT PRIMARY SCHOOL under PEDP4 Construction of Head teacherâs room with attached toilet of Angikara GOVT PRIMARY SCHOOL under PEDP4. Construction of Head teacherâs room with attached toilet of Razia Khatun Provati GOVT PRIMARY SCHOOL under PEDP4.
ITT 30.1 The required Technical Proposal shall include the following additional information: Revised RDPP of PEDP4 is under approval process, So contact agreement can not be signed before RDPP approval if RDPP (2nd revision) of PEDP4 does not get approval then Tender will be cancelled.