Up to date VAT, IT and Trade license.,
A satisfactory completion of similar works of at least Tk. 1.00 lac under 1 of contract(s) over a period of 5 years shall be required.
The required average annual construction turnover shall be greater than Tk. 3.00 lac over the last 5 years.
The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk. 1.00 lac.
During evaluation if the quoted rate by any tenderer is found more than 10% less/above than the Official Estimated price, then the respective tenderer will be revoked from the tender.
Specials Repairs to ADC Rev. office in 1st floor of DCs office Pabna.FY-2016-17