1. A satisfactory completion of similar works at least Tk. 81.00 Lac under single of contract(s) over a period of 05 years shall be required.
02.The required average annual construction turnover shall be greater than Tk. 108.00 Lac over the last 05 years. Turnover will be calculated on the basis of payment certificates only.
03.The minimum amount of liquid assets or working capital or credit facilities ofthe Tenderer shall be Tk. 81.00 Lac.
04. All Tenderers must have to satisfy the criteria as stated in the TDS. If the criteria is not satisfied, the tenderer will be non-responsive. If the quoted price varies by more than 5.00% above/less of the engineers estimate then submit rate analysis.
05. This Work Cosist of Salvage Material
Item Code. 02/02/05
Item Name. Deduction of Value of Suitable Soil Recovered From Existing Road Pavement
Quantity. 111.00 Cum
Unit Rate. 411.001 Tk/Cum
Total . 45621.111 Tk
Item Code. 02/02/06
Item Name. Deduction of Value of Materials Recovered From Existing Road Pavement
Quantity. 101.00 Cum
Unit Rate. 3398.001 Tk/Cum
Total . 343198.101 Tk
Item Code. 02/09/03a
Item Name. Deduction of value of Materials recovered from Structure
Quantity. 1.00 LS
Unit Rate. 25000.001 Tk/LS
Total . 25000.001 Tk
Total Deduction Amount. 413819.213 Tk
6. The Tenderer must submit a signed copy of the attached formats in Section 7 and 8.
|