As per TDS.
Re-construction of Footover Bridge (Size- 226 ft x 8 ft ) with over shed & dismantling of existing Footover Bridge (182 ft Long ) with related other ancillary works in BG section and strenthening existing Footover Bridge (46 ft Long ) in MG section at Santahar station as per Drawing. ( 1st Phase)