As Per STD Tender sequrity Mustbe submitted scancopy otherwise tenderer will be reject. Tenderer choted rate if excesses 10% less or above from official estimated cost than the Tenderer mast be nonresponsible.
Installation of 6 Six Nos. 38 mm dia uPVC Test Tubewell 3 Three Nos. 150 x 350 mm dia uPVC Production well Construction of 03 Three Nos. pump house with Boundary Wall and Supply and Installation of 03 Three Nos. Submersible pump motor set and 03 Three Nos. Electric Transformer and other Electrical materials under 37 District Towns Water Supply Project at Kushtia Pourashava. During the year-2016-2017.