As Per TDS
LGCRRP/Madhabpur/2024-25/W-09 Construction of RCC Drain from Old RCC Drain near Taher Miah house to Jewel Miah house at Sobujbag (W-06) under Madhabpur Pourashava (Ch.00-160m). Construction of RCC Drain from East Madhabpur Faruk Miah house to Iman Ali house Via Alem Uddin house at East Madhabpur (Ward no 01) under Madhabpur Pourashava (Ch.00-400m). Construction of RCC Drain from North Side of Upazila Complex From Mohammed Ali Patan house to Sadar Hospital (W-07) under Madhabpur Pourashava (Ch.00-60m).