As per TDS
LGCRRP/Savar/2024-25/W-25 (1) Upgrading of RCC Road starting from Moddoh Rajation H/O Mr. Mizan to H/O Mr. Hafez Deloyer in ward no - 08, under Savar Pourashava, Savar,Dhaka (Ch 0.00-170.00m). (2) Construction of RCC Drain (With Slab) starting from Moddoh Rajation Eidgha Math Jame mosque to H/O Mr. Hafez Deloyer in ward no-08, under Savar Pourashava, Savar, Dhaka. (Ch0.00-222.00m). (3) Upgrading of RCC Road starting from Rajation Mondol para H/O mr Habib to Mondol para Jame Mosque at Rajation H/O Mr. Hakim & H/O Mr. Aklas Mia in ward no-08 under Savar Pourashava, Savar, Dhaka (Ch0.00-161.00.00m). (4) Construction of RCC Drain (With Slab) starting from Moddoh Rajation H/O Mr.Hasan to H/O Mr. Arob Ali via H/O Mr. Rayhan & Mr Tofazzol in ward-08 under Savar Pourashava, Savar, Dhaka. (Ch0.00-130.00m). (5) Upgrading of RCC Road starting from Moddoh Rajation H/O Mr.Hasan to Mr. Arob Ali via H/O Mr. Rayhan & Mr Tofazzol in ward no-08, under Savar Pourashava, Savar, Dhaka. (Ch0.00-130.00m).