Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | TDS of this tender needs to be corrected for proper interpretation. |
| Field Name | Old Value | New Value |
|---|---|---|
| Eligibility of Consultant |
As per TDS & PCC |
As per TDS & PCC |
| TDS/PDS--D. Tender Preparation-- | Tenderer shall submit with its Tender, the following additional documents:
(a). The minimum number of years of general experience of the Tenderer to manufacture wooden and steel furniture works shall be minimum Five (05) years.
(b). The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least 01 (one) contract of similar nature of works, (Wooden & Steel furniture) i.e. any Wooden & Steel furniture manufacture successfully completed within the last 05 years with a value of at least Tk 49.75 Lacs of Government/ Semi-Government/ Autonomous Bodies in Bangladesh. i.e. years counting backward from the date of publication of IFT in the e-GP System. The above experience/ work completion certificate shall have to be submitted as follows: iii Experience Certificate approved through e-GP system will be preferred.
(c). The Tenderer shall have minimum amount of liquid assets BDT Tk 60.00 lacs i.e. working capital or credit line(s), net of other contractual commitments at the time of Tender submission with the standard format of CPTU (PW2a-3) (h) Tenderer shall submit an assurance certificate declaring explicitly to perform the job within time duly. (i). Members for Bangladesh Furniture Industries Owners Association (j) Rule 27(2) of PPR/2008 will be applied in case of front loading (k) Tenderer shall submit an assurance certificate declaring manufacture/ supply of qualified products. Otherwise the products to be rejected and all rejected products replacing with new demanded products by the required authority. l) Minimum supply/ production capacity (in any govt. organization/semi govt/ autonomous body/ Private Organization) of minimum 5 sets of furniture (wooden/ steel) supply/ manufacture by 5 Years, in a minimum amount of TK 300.00 lacs, years counting backward from the date of publication of IFT. (Certificate of the minimum supply capacity shall be on the basis of Acceptance Certificate and Certificate of the minimum production capacity from manufacturer is allowable only.)
m) Confirmation Certificate of Warranty Period for at least One (1) year from the manufacturing company is mandatory q) The duration of working time may be extended; if the project time delayed. So that site handed over to be depended on it. r) Products will be taken care of by the contractor until authority would receive finally till the end of project (as per situation). s) No performance guarantee and retention money/ security money won't clear until authority would receive the products. t)All other required qualifications, special terms & conditions of the tender are shown in the ITT, GCC & Tender Data Sheet (TDS), Tender Documents, and PCC. u)Before submission of tender documents , selected list of required furnitures must be physically delivered to Office of the Sub Divisional Engineer, PWD E/M Wood Workshop Sub Division, Mirpur, Dhaka and delivered of sample furnitures received certificate must be signed by an officer of minimum rank of sub-divisional engineer and document must be submitted. |
Tenderer shall submit with its Tender, the following additional documents:
(a). The minimum number of years of general experience of the Tenderer to manufacture wooden and steel furniture works shall be minimum Five (05) years.
(b). The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least 01 (one) contract of similar nature of works, (Wooden & Steel furniture) i.e. any Wooden & Steel furniture manufacture successfully completed within the last 05 years with a value of at least Tk 49.75 Lacs of Government/ Semi-Government/ Autonomous Bodies in Bangladesh. i.e. years counting backward from the date of publication of IFT in the e-GP System. The above experience/ work completion certificate shall have to be submitted as follows: iii Experience Certificate approved through e-GP system will be preferred.
(c). The Tenderer shall have minimum amount of liquid assets BDT Tk 60.00 lacs i.e. working capital or credit line(s), net of other contractual commitments at the time of Tender submission with the standard format of CPTU (PW2a-3) (h) Tenderer shall submit an assurance certificate declaring explicitly to perform the job within time duly. (i). Members for Bangladesh Furniture Industries Owners Association (j) Rule 27(2) of PPR/2008 will be applied in case of front loading (k) Tenderer shall submit an assurance certificate declaring manufacture/ supply of qualified products. Otherwise the products to be rejected and all rejected products replacing with new demanded products by the required authority. l) Minimum supply/ production capacity (in any govt. organization/semi govt/ autonomous body/ Private Organization) of minimum 5 sets of furniture (wooden/ steel) supply/ manufacture by 5 Years, in a minimum amount of TK 300.00 lacs, years counting backward from the date of publication of IFT. (Certificate of the minimum supply capacity shall be on the basis of Acceptance Certificate and Certificate of the minimum production capacity from manufacturer is allowable only.)
m) Confirmation Certificate of Warranty Period for at least One (1) year from the manufacturing company is mandatory q) The duration of working time may be extended; if the project time delayed. So that site handed over to be depended on it. r) Products will be taken care of by the contractor until authority would receive finally till the end of project (as per situation). s) No performance guarantee and retention money/ security money won't clear until authority would receive the products. t)All other required qualifications, special terms & conditions of the tender are shown in the ITT, GCC & Tender Data Sheet (TDS), Tender Documents, and PCC. u)Before submission of tender documents , selected list of required furnitures must be physically delivered to Office of the Sub Divisional Engineer, PWD E/M Wood Workshop Sub Division, Mirpur, Dhaka and delivered of sample furnitures received certificate must be signed by an officer of minimum rank of sub-divisional engineer and document must be submitted. |
| Brief Description of Goods,Works or Service | Manufacturing, Supplying and Fitting of Furniture for National Institute of Ophthalmology and Hospital, Sher-e - Bangla Nagar. Dhaka. F.Y. 2024-25 |
Manufacturing, Supplying and Fitting of Furniture for National Institute of Ophthalmology and Hospital, Sher-e - Bangla Nagar. Dhaka. F.Y. 2024-25 |