| Eligibility of Consultant
|
(a) The minimum number of years of general experience of the Tenderer shall be 03 (Three) Years; years counting backward from the date of publication of IFT in the e-GP System. The Tenderer has to submit NOA/Purchase Order/Work Order/Contract etc. as evidence of general experience.
(b) The satisfactory completion of supply of Mechanical or Electrical Equipment / Spares/ Goods under a Single Contract with contract value of minimum Taka 17,00,000/-(Seventeen Lakh) in the last 03 (Three) years which shall be supported by End user Certificate/Work completion Certificate/ Final acceptance certificate etc. from the purchaser in the Letter Head Pad of the Purchaser, duly sealed and signed, mentioning Contract Value and Date of Supply against specific experience; years counting backward from the date of publication of IFT in the e-GP System. NOA/Purchase Order/Work Order/Contract etc. shall not be treated as evidence of specific experience.
(c) The minimum amount of liquid assets i.e. working capital or credit line(s), net of other contractual commitments is Taka 17,00,000/-(Seventeen Lakh), on or after the date of publication of Invitation for Tender (IFT) Notice.
|
(a) The minimum number of years of general experience of the Tenderer shall be 03 (Three) Years; years counting backward from the date of publication of IFT in the e-GP System. The Tenderer has to submit NOA/Purchase Order/Work Order/Contract etc. as evidence of general experience.
(b) The satisfactory completion of supply of Mechanical or Electrical Equipment / Spares/ Goods under a Single Contract with contract value of minimum Taka 17,00,000/-(Seventeen Lakh) in the last 03 (Three) years which shall be supported by End user Certificate/Work completion Certificate/ Final acceptance certificate etc. from the purchaser in the Letter Head Pad of the Purchaser, duly sealed and signed, mentioning Contract Value and Date of Supply against specific experience; years counting backward from the date of publication of IFT in the e-GP System. NOA/Purchase Order/Work Order/Contract etc. shall not be treated as evidence of specific experience.
(c) The minimum amount of liquid assets i.e. working capital or credit line(s), net of other contractual commitments is Taka 17,00,000/-(Seventeen Lakh), on or after the date of publication of Invitation for Tender (IFT) Notice.
|
| PCC .5 Suppliers Responsibilites5.1Delivery and Documents
|
| Delivery and Documents |
|---|
| The Site is located at Haripur 412 MW Combined Cycle Power Plant, EGCB Ltd., Haripur, Bandar, Narayanganj, Bangladesh. | | The following documents shall also be part of the Contract: (a) Performance Security; (b) Relevant correspondences prior to signing of the Contract agreement. | | The scope of Supply as well as the Supplier's Responsibilities shall be as follows: The Supplier has to complete the Delivery of the Goods in accordance with the Technical Specifications and Compliance of Goods and related services as specified in e-PG2-3 and Price and Delivery Schedule for Goods as specified in e-PG2-2A . | | The documents to be furnished by the Supplier shall be as follows: (a). Three (3) Copies of Supplier's Invoice and Three (3) Copies of the Supplier's Delivery Challan showing the goods' description, quantity, unit price, and total amount. (b). Warranty certificate stating the quality, quantity, genuineness of the supplied goods along with validity of warranty period. | | GCC Clause 7. Acceptance: GCC Clause 7.2 has been replaced as follows: The Technical Inspection and Acceptance Committee of the Procuring Entity is the Post Landing Inspection (PLI) Committee for Local Purchase of Haripur 412 MW CCPP. | | GCC Clause 10.Terms of Payment: GCC Clause 10.1 has been replaced as follows: (a) Advance Payment shall not be paid. Price Adjustment shall not be allowed. (b) Payment under this Contract shall be made in Bangladeshi Taka through Bangladesh Electronic Funds Transfer Network (BEFTN) or Account Payee cheque in favor of Supplier's Bank Account in the following manner: On Delivery and R&I: According to the price mentioned in the Contract, Hundred percent (100%) of the Price of the Delivered Goods & Related Services shall be paid upon submission of documents specified in GCC Clause 5.1.4 of PCC, supported by Receiving & Inspection (R&I) Report, along with the Provisional Acceptance Certificate issued by Superintending Engineer (Maintenance), Haripur 412 MW CCPP. (C) Bill Payment: Note 1: All Bills (Invoices), submitted by the supplier, shall be certified by concerned Assistant Engineer/Sub-Divisional Engineer (Mechanical Maintenance Division) and Executive Engineer (Mechanical Maintenance Division), Haripur 412 MW CCPP, and recommended by Superintending Engineer (Maintenance), Haripur 412 MW CCPP, and approved by Chief Engineer, Haripur 412 MW CCPP for payment approval. Note 2: VAT & AIT on payable amount shall be deducted from the bill as per prevailing rules and regulations of GOB. Note 3: Final Acceptance Certificate (FAC): The Final Acceptance Certificate (FAC) shall be issued by Superintending Engineer (Maintenance), Haripur 412 MW CCPP, EGCB Ltd., Haripur, Narayanganj, after successful completion of the warranty period. Should the goods be found defective or not in conformity with the requirements of the contract, the Final Acceptance Certificate (FAC) shall be withheld until such time as the defects have been corrected. | | Provisional Acceptance Certificate (PAC): The Provisional Acceptance Certificate (PAC) shall be issued by Superintending Engineer (Maintenance), Haripur 412 MW CCPP, EGCB Ltd., Haripur, Narayanganj, after successful delivery of Goods by the Supplier. | | Payments shall be made in no case later than the 60 (Sixty) days after submission of an invoice or request for payment by the Supplier, and after the PE has accepted it. | | GCC Clause 11.Performance Security: GCC Clause 11.2 has been replaced by the following text: 11.2 (i) On request from the Supplier, the Performance Security shall be discharged by the Procuring Entity and returned to the Supplier not later than Thirty (30) days following the date of Completion of the Supplier's performance obligations under the Contract, including any warranty obligations as stated under GCC Clause 5.1.10 of PCC and issuance of Final Acceptance Certificate by EGCB Ltd., provided that there are no claims filed against the supplier. If Performance Security validity period expires before the warranty period, the supplier shall increase the Performance Security validity period up to minimum Thirty (30) days from the end date of warranty period. (ii) The amount of Performance Security shall be Ten (10%) percent of the Contract Price or any other amount as will be mentioned in Notification of Award (NOA) with 12 (Twelve) months validity. (iii) The Performance Security shall have to be paid to the account named "Chief Engineer, Haripur 412 MW Combined Cycle Power Plant, EGCB Ltd., Haripur, Bandar, Narayanganj". | | PCC Clause 13.1 mentioned below, has been replaced by the following text: The period of validity of the Warranty shall be 180 days from the date of Issuance of PLI Report from Store of PE for the goods delivered. | | The Supplier shall correct any defects covered by the Warranty within 30 (Thirty) days of being notified by the PE of the occurrence of such defects. | | GCC Clause 15.Liquidated Damages: GCC Clause 15.1 has been replaced by the following text:15.1 Subject to the grant of time extensions by Procuring Entity, if the Supplier fails to deliver any or all of the Goods by the Date(s) of delivery and/or perform the Related Services within the period specified in the Contract, the Procuring Entity shall , without prejudice to all its other remedies under the Contract, deduct from the Contract Price, as liquidated damages, a sum equivalent to the 0.1 percent of the Contract Price of the delayed Goods or unperformed Related Services for each day of delay or part thereof of delay until actual delivery or performance, up to a maximum deduction (10% of the Total Contract Price) . Once the maximum is reached, the Procuring Entity may terminate the Contract as stated under GCC Clause 16. | | The arbitration shall be conducted in accordance with the Arbitration Act (Act No 1 of 2001) of Bangladesh as at present in force and in IEB (Institution of Engineers, Bangladesh), Dhaka, Bangladesh. The name of the Adjudicator shall be finalized by both the Procuring Entity and the Supplier, if necessary, after contract signing. The name of the appointing authority of the Adjudicator are both the Procuring Entity and the Supplier. In case of disagreement between the Procuring Entity and the Supplier, the Appointing Authority of the Adjudicator is the President of the Institution of Engineers, Bangladesh (IEB). | | During Goods Delivery, the Tenderer shall have to submit a Certificate issued by the OEM (EMW filtertechnik GmbH), confirming that, the offered items are new, unused, in good condition. The certificate must be issued on the letterhead pad containing the OEM name, address, fax, phone, e-mail, website, etc. for necessary correspondence. The product will not be received if the supplier fails to submit a certificate during delivery. | |
| Delivery and Documents |
|---|
| The Site is located at Haripur 412 MW Combined Cycle Power Plant, EGCB Ltd., Haripur, Bandar, Narayanganj, Bangladesh. | | The following documents shall also be part of the Contract: (a) Performance Security; (b) Relevant correspondences prior to signing of the Contract agreement. | | The scope of Supply as well as the Supplier's Responsibilities shall be as follows: The Supplier has to complete the Delivery of the Goods in accordance with the Technical Specifications and Compliance of Goods and related services as specified in e-PG2-3 and Price and Delivery Schedule for Goods as specified in e-PG2-2A . | | The documents to be furnished by the Supplier shall be as follows: (a). Three (3) Copies of Supplier's Invoice and Three (3) Copies of the Supplier's Delivery Challan showing the goods' description, quantity, unit price, and total amount. (b). Warranty certificate stating the quality, quantity, genuineness of the supplied goods along with validity of warranty period. | | GCC Clause 7. Acceptance: GCC Clause 7.2 has been replaced as follows: The Technical Inspection and Acceptance Committee of the Procuring Entity is the Post Landing Inspection (PLI) Committee for Local Purchase of Haripur 412 MW CCPP. | | GCC Clause 10.Terms of Payment: GCC Clause 10.1 has been replaced as follows: (a) Advance Payment shall not be paid. Price Adjustment shall not be allowed. (b) Payment under this Contract shall be made in Bangladeshi Taka through Bangladesh Electronic Funds Transfer Network (BEFTN) or Account Payee cheque in favor of Supplier's Bank Account in the following manner: On Delivery and R&I: According to the price mentioned in the Contract, Hundred percent (100%) of the Price of the Delivered Goods & Related Services shall be paid upon submission of documents specified in GCC Clause 5.1.4 of PCC, supported by Receiving & Inspection (R&I) Report, along with the Provisional Acceptance Certificate issued by Superintending Engineer (Maintenance), Haripur 412 MW CCPP. (C) Bill Payment: Note 1: All Bills (Invoices), submitted by the supplier, shall be certified by concerned Assistant Engineer/Sub-Divisional Engineer (Mechanical Maintenance Division) and Executive Engineer (Mechanical Maintenance Division), Haripur 412 MW CCPP, and recommended by Superintending Engineer (Maintenance), Haripur 412 MW CCPP, and approved by Chief Engineer, Haripur 412 MW CCPP for payment approval. Note 2: VAT & AIT on payable amount shall be deducted from the bill as per prevailing rules and regulations of GOB. Note 3: Final Acceptance Certificate (FAC): The Final Acceptance Certificate (FAC) shall be issued by Superintending Engineer (Maintenance), Haripur 412 MW CCPP, EGCB Ltd., Haripur, Narayanganj, after successful completion of the warranty period. Should the goods be found defective or not in conformity with the requirements of the contract, the Final Acceptance Certificate (FAC) shall be withheld until such time as the defects have been corrected. | | Provisional Acceptance Certificate (PAC): The Provisional Acceptance Certificate (PAC) shall be issued by Superintending Engineer (Maintenance), Haripur 412 MW CCPP, EGCB Ltd., Haripur, Narayanganj, after successful delivery of Goods by the Supplier. | | Payments shall be made in no case later than the 60 (Sixty) days after submission of an invoice or request for payment by the Supplier, and after the PE has accepted it. | | GCC Clause 11.Performance Security: GCC Clause 11.2 has been replaced by the following text: 11.2 (i) On request from the Supplier, the Performance Security shall be discharged by the Procuring Entity and returned to the Supplier not later than Thirty (30) days following the date of Completion of the Supplier's performance obligations under the Contract, including any warranty obligations as stated under GCC Clause 5.1.10 of PCC and issuance of Final Acceptance Certificate by EGCB Ltd., provided that there are no claims filed against the supplier. If Performance Security validity period expires before the warranty period, the supplier shall increase the Performance Security validity period up to minimum Thirty (30) days from the end date of warranty period. (ii) The amount of Performance Security shall be Ten (10%) percent of the Contract Price or any other amount as will be mentioned in Notification of Award (NOA) with 12 (Twelve) months validity. (iii) The Performance Security shall have to be paid to the account named "Chief Engineer, Haripur 412 MW Combined Cycle Power Plant, EGCB Ltd., Haripur, Bandar, Narayanganj". | | PCC Clause 13.1 mentioned below, has been replaced by the following text: The period of validity of the Warranty shall be 180 days from the date of Issuance of PLI Report from Store of PE for the goods delivered. | | The Supplier shall correct any defects covered by the Warranty within 30 (Thirty) days of being notified by the PE of the occurrence of such defects. | | GCC Clause 15.Liquidated Damages: GCC Clause 15.1 has been replaced by the following text:15.1 Subject to the grant of time extensions by Procuring Entity, if the Supplier fails to deliver any or all of the Goods by the Date(s) of delivery and/or perform the Related Services within the period specified in the Contract, the Procuring Entity shall , without prejudice to all its other remedies under the Contract, deduct from the Contract Price, as liquidated damages, a sum equivalent to the 0.1 percent of the Contract Price of the delayed Goods or unperformed Related Services for each day of delay or part thereof of delay until actual delivery or performance, up to a maximum deduction (10% of the Total Contract Price) . Once the maximum is reached, the Procuring Entity may terminate the Contract as stated under GCC Clause 16. | | The arbitration shall be conducted in accordance with the Arbitration Act (Act No 1 of 2001) of Bangladesh as at present in force and in IEB (Institution of Engineers, Bangladesh), Dhaka, Bangladesh. The name of the Adjudicator shall be finalized by both the Procuring Entity and the Supplier, if necessary, after contract signing. The name of the appointing authority of the Adjudicator are both the Procuring Entity and the Supplier. In case of disagreement between the Procuring Entity and the Supplier, the Appointing Authority of the Adjudicator is the President of the Institution of Engineers, Bangladesh (IEB). | | During Goods Delivery, the Tenderer shall have to submit a Certificate issued by the OEM , confirming that, the offered items are new, unused, in good condition. The certificate must be issued on the letterhead pad containing the OEM name, address, fax, phone, e-mail, website, etc. for necessary correspondence. The product will not be received if the supplier fails to submit a certificate during delivery. | |
| TDS/PDS--D. Tender Preparation--
|
The Tenderer shall submit with its e-Tender the following additional documents:
(a) Valid and Updated Trade license.
(b) Tax Return Slip/Income Tax Certificate of last FY 2023-24 including TIN Certificate of Supplier.
(c) VAT Registration Certificate (BIN).
(d) Documentary evidence in support of ITT 9.1 & 9.2 of TDS.
(e) Warranty certificate: Tender must submit tenderer's Warranty certificate stating the quality, quantity, genuinness of the supplied goods along with validity of warranty period. The period of validity of the Warranty shall be 180 days from the date of Issuance of Post Landing Inspection Report.
(f)Tenderers shall submit Product datasheet/Catalog/ Cross sectional drawing/ O&M manual/ equivalent document of the goods mentioned in Technical Specifications and Compliance of Goods and related services (Form e-PG2-3)
(g) A Manufacturer’s Authorisation Letter is required for all the items. |
The Tenderer shall submit with its e-Tender the following additional documents:
(a) Valid and Updated Trade license.
(b) Tax Return Slip/Income Tax Certificate of last FY 2023-24 including TIN Certificate of Supplier.
(c) VAT Registration Certificate (BIN).
(d) Documentary evidence in support of ITT 9.1 & 9.2 of TDS.
(e) Warranty certificate: Tender must submit tenderer's Warranty certificate stating the quality, quantity, genuinness of the supplied goods along with validity of warranty period. The period of validity of the Warranty shall be 180 days from the date of Issuance of Post Landing Inspection Report.
(f)Tenderers shall submit Product datasheet/Catalog/ Cross sectional drawing/ O&M manual/ equivalent document of the goods mentioned in Technical Specifications and Compliance of Goods and related services (Form e-PG2-3)
(g) A Manufacturer’s Authorisation Letter is required for all the items.
(h) Test Report(s) of offered Coalescer filter must be submitted. In the Test Report (s), name, address, phone, fax, email address of testing laboratories & design standard code no. should be clearly mentioned
(i) Sample Coalescer filter must be submitted on the tender opening day to the Executive Engineer, Mechanical Maintenance Division, Haripur 412 MW CCPP. These samples are for physical verification and testing in the existing air filtration system of the Haripur 412 MW CCPP GT unit. The submission is non-refundable; physical verification and tests will be conducted during evaluation. The tenderer or their authorized representative must sign the sample.
|