View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | TDS Correction. |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 09/04/2025 17:00 | 15/04/2025 10:00 |
| Eligibility of Consultant | The invitation for tender is open to all eligible tenderers as mentioned below: |
The invitation for tender is open to all eligible tenderers as mentioned below: |
| Opening Date & Time | 10/04/2025 12:00 | 15/04/2025 12:00 |
| Last date & time for Tender/Proposal Security Submission | 10/04/2025 11:00 | 15/04/2025 11:00 |
| Closing Date & Time | 10/04/2025 12:00 | 15/04/2025 12:00 |
| TDS/PDS--C. Qualification Criteria-- | The required average annual construction turnover shall be greater than Tk .................... over the last 3 years.
[ the required average annual construction turn over is recommended to be about less than or equal to the estimated annual cash flow for the Contract; however the multiplier may vary from 0.30 to 1.00 ; [ years counting backward from the date of publication of IFT in the newspaper. The period may be best three (3) years in the last five (5) years or best five (5) years in the last ten (10) years (as appropriate)] |
The required average annual construction turnover shall be greater than Tk.1510000/-over the last 3(Three) years.
[ the required average annual construction turn over is recommended to be about less than or equal to the estimated annual cash flow for the Contract; however the multiplier may vary from 0.30 to 1.00 ; [ years counting backward from the date of publication of IFT in the newspaper. The period may be best three (3) years in the last five (5) years or best five (5) years in the last ten (10) years (as appropriate)] |
| TDS/PDS--C. Qualification Criteria-- |
[usually the required liquid asset is the equivalent of 2-6 months payment flow at the average construction rate (straight line distribution), accessible or available after taking into account the financial requirements of existing commitments. The actual period will depend on the speed with which the PE will pay the Contractor’s monthly certificate, allowing time to prepare an invoice, for the Project Manager’s time to certify it, and at least one month contingency for preparing the cheque and making actual payment.
Therefore, the minimum required liquid asset will be Tk. 6 lakh, i.e. 3 months cash flow based on the above assumptions.] |
[usually the required liquid asset is the equivalent of 2-6 months payment flow at the average construction rate (straight line distribution), accessible or available after taking into account the financial requirements of existing commitments. The actual period will depend on the speed with which the PE will pay the Contractor’s monthly certificate, allowing time to prepare an invoice, for the Project Manager’s time to certify it, and at least one month contingency for preparing the cheque and making actual payment.
Therefore, the minimum required liquid asset will be Tk. 6 lakh, i.e. 3 months cash flow based on the above assumptions.] |
| TDS/PDS--C. Qualification Criteria-- |
The minimum capacity shall be:[70%-80% of the official estimated cost]
Where
For Tenders where the package contains more than one (1) Lot, this qualification requirement shall be mentioned separately for each lot in the package |
The minimum capacity shall be:[70%-80% of the official estimated cost]
Where
For Tenders where the package contains more than one (1) Lot, this qualification requirement shall be mentioned separately for each lot in the package |
| TDS/PDS--C. Qualification Criteria-- | A satisfactory completion of similar works of at least Tk .............................. under [1] of contract(s) over a period of 3 (Three) years shall be required. [the minimum value of the similar works under a single or multiple number of contract(s) is recommended to be between 50 and 75 percent of the estimated cost, rounded off to nearest Taka thousand, of the proposed work. years counting backward from the date of publication of IFT in the newspaper] [for Tenders where the package contains more than one (1) lot, this qualification requirements, shall be mentioned separately for each lot in the package] |
A satisfactory completion of similar works of at least Tk.1140000/-under 1(One) of contract(s) over a period of 3 (Three) years shall be required. [the minimum value of the similar works under a single or multiple number of contract(s) is recommended to be between 50 and 75 percent of the estimated cost, rounded off to nearest Taka thousand, of the proposed work. years counting backward from the date of publication of IFT in the newspaper] [for Tenders where the package contains more than one (1) lot, this qualification requirements, shall be mentioned separately for each lot in the package] |
| Brief Description of Goods,Works or Service | Repairing of Civil works at Training Complex, Mirpur, & Mirpur (Dhaka) fire Statio |
Repairing of Civil works at Training Complex, Mirpur, & Mirpur (Dhaka) fire Statio |