Amendment / Corrigendum No. : 3
|
|
| Amendment / Corrigendum Text : | Official Cost Estimate should be changed due to further analysis by Higher Official. /Approving authority. |
| Field Name | Old Value | New Value |
|---|---|---|
| TDS/PDS--C. Qualification Criteria-- |
|
|
| TDS/PDS--C. Qualification Criteria-- |
|
|
| TDS/PDS--C. Qualification Criteria-- |
The minimum capacity is BDT TK 79 lacs. |
The minimum capacity is BDT TK 74 lacs. |
| TDS/PDS--C. Qualification Criteria-- |
The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in procurement of Works works of at least 01 (one) contract of similar nature of works, (Wooden & Steel furniture) i.e. any Wooden & Steel furniture manufacture successfully completed within the last 05 years with a value of at least BDT Tk 74 Lacs of Government/ Semi-Government/ Autonomous Bodies in Bangladesh. i.e. years counting backward from the date of publication of IFT in the e-GP System. The above experience/ work completion certificate shall have to be submitted as follows:
i In case of the work done under PWD, the certifying and authenticating authority shall be the concerned Executive Engineer. iii Experience Certificate approved through e-GP system will be preferred. |
The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in procurement of Works works of at least 01 (one) contract of similar nature of works, (Wooden & Steel furniture) i.e. any Wooden & Steel furniture manufacture successfully completed within the last 05 years with a value of at least BDT Tk 70 Lacs of Government/ Semi-Government/ Autonomous Bodies in Bangladesh. i.e. years counting backward from the date of publication of IFT in the e-GP System. The above experience/ work completion certificate shall have to be submitted as follows:
i In case of the work done under PWD, the certifying and authenticating authority shall be the concerned Executive Engineer. iii Experience Certificate approved through e-GP system will be preferred. |
| TDS/PDS--D. Tender Preparation-- | Tenderer shall submit with its Tender, the following additional documents:
(a). The minimum number of years of general experience of the Tenderer to manufacture wooden and steel furniture works shall be minimum Five (05) years.
(b). The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in procurement of works of at least 01 (one) contract of similar nature of works, (Wooden & Steel furniture) i.e. any Wooden & Steel furniture manufacture successfully completed within the last 05 years with a value of at least BDT Tk 74 Lacs of Government/ Semi-Government/ Autonomous Bodies in Bangladesh. i.e. years counting backward from the date of publication of IFT in the e-GP System. The above experience/ work completion certificate shall have to be submitted as follows: iii Experience Certificate approved through e-GP system will be preferred.
(c). The Tenderer shall have minimum amount of liquid assets BDT TK 69 lacs i.e. working capital or credit line(s), net of other contractual commitments at the time of Tender submission with the standard format of CPTU (PW2a-3) (h) Tenderer shall submit an assurance certificate declaring explicitly to perform the job within time duly. (i).Tenderer is expected to be the Member for Bangladesh Furniture Industries Owners Association (j) Rule 27(2) of PPR/2008 will be applied in case of front loading (k) Tenderer shall submit an assurance certificate declaring manufacture/ supply of qualified products. Otherwise the products to be rejected and all rejected products replacing with new demanded products by the required authority. l) Minimum supply/ production capacity (in any govt. organization/semi govt/ autonomous body/ Private Organization) of minimum 5 sets of furniture (wooden/ steel) supply/ manufacture by 5 Years, in a minimum amount of BDT TK 370.00 lacs, years counting backward from the date of publication of IFT. (Certificate of the minimum supply capacity shall be on the basis of Acceptance Certificate and Certificate of the minimum production capacity from manufacturer is allowable only.)
m) Confirmation Certificate of Warranty Period for at least One (1) year from the manufacturing company is mandatory q) The duration of working time may be extended; if the project time delayed. So that site handed over to be depended on it. r) Products will be taken care of by the contractor until authority would receive finally till the end of project (as per situation). s) No performance guarantee and retention money/ security money won't clear until authority would receive the products. t)All other required qualifications, special terms & conditions of the tender are shown in the ITT, GCC & Tender Data Sheet (TDS), Tender Documents, and PCC. u)Before submission of tender documents , selected list of required furnitures must be physically delivered to Office of the Sub Divisional Engineer, PWD E/M Wood Workshop Sub Division, Mirpur, Dhaka and delivered of sample furnitures received certificate must be signed by an officer of minimum rank of sub-divisional engineer and document must be submitted.( Mandatory) |
Tenderer shall submit with its Tender, the following additional documents:
(a). The minimum number of years of general experience of the Tenderer to manufacture wooden and steel furniture works shall be minimum Five (05) years.
(b). The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in procurement of works of at least 01 (one) contract of similar nature of works, (Wooden & Steel furniture) i.e. any Wooden & Steel furniture manufacture successfully completed within the last 05 years with a value of at least BDT Tk 70 Lacs of Government/ Semi-Government/ Autonomous Bodies in Bangladesh. i.e. years counting backward from the date of publication of IFT in the e-GP System. The above experience/ work completion certificate shall have to be submitted as follows: iii Experience Certificate approved through e-GP system will be preferred.
(c). The Tenderer shall have minimum amount of liquid assets BDT TK 65 lacs i.e. working capital or credit line(s), net of other contractual commitments at the time of Tender submission with the standard format of CPTU (PW2a-3) (h) Tenderer shall submit an assurance certificate declaring explicitly to perform the job within time duly. (i).Tenderer is expected to be the Member for Bangladesh Furniture Industries Owners Association (j) Rule 27(2) of PPR/2008 will be applied in case of front loading (k) Tenderer shall submit an assurance certificate declaring manufacture/ supply of qualified products. Otherwise the products to be rejected and all rejected products replacing with new demanded products by the required authority. l) Minimum supply/ production capacity (in any govt. organization/semi govt/ autonomous body/ Private Organization) of minimum 5 sets of furniture (wooden/ steel) supply/ manufacture by 5 Years, in a minimum amount of BDT TK 350 lacs, years counting backward from the date of publication of IFT. (Certificate of the minimum supply capacity shall be on the basis of Acceptance Certificate and Certificate of the minimum production capacity from manufacturer is allowable only.)
m) Confirmation Certificate of Warranty Period for at least One (1) year from the manufacturing company is mandatory q) The duration of working time may be extended; if the project time delayed. So that site handed over to be depended on it. r) Products will be taken care of by the contractor until authority would receive finally till the end of project (as per situation). s) No performance guarantee and retention money/ security money won't clear until authority would receive the products. t)All other required qualifications, special terms & conditions of the tender are shown in the ITT, GCC & Tender Data Sheet (TDS), Tender Documents, and PCC. u)Before submission of tender documents , selected list of required furnitures must be physically delivered to Office of the Sub Divisional Engineer, PWD E/M Wood Workshop Sub Division, Mirpur, Dhaka and delivered of sample furnitures received certificate must be signed by an officer of minimum rank of sub-divisional engineer and document must be submitted.( Mandatory) |
| Tender/Proposal Security (Amount in BDT)(Lot No : 1) | 250000.0 | 235000 |
|
Amendment / Corrigendum No. : 2
|
|
| Amendment / Corrigendum Text : | For updated official cost estimate liquid asset, turnover, specific experience, capacity should be ammended. |
| Field Name | Old Value | New Value |
|---|---|---|
| TDS/PDS--C. Qualification Criteria-- |
|
|
| TDS/PDS--C. Qualification Criteria-- |
|
|
| TDS/PDS--C. Qualification Criteria-- |
The minimum capacity is BDT TK 74.00 lacs. |
The minimum capacity is BDT TK 79 lacs. |
| TDS/PDS--C. Qualification Criteria-- |
The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in procurement of Works works of at least 01 (one) contract of similar nature of works, (Wooden & Steel furniture) i.e. any Wooden & Steel furniture manufacture successfully completed within the last 05 years with a value of at least BDT Tk 70.00 Lacs of Government/ Semi-Government/ Autonomous Bodies in Bangladesh. i.e. years counting backward from the date of publication of IFT in the e-GP System. The above experience/ work completion certificate shall have to be submitted as follows:
i In case of the work done under PWD, the certifying and authenticating authority shall be the concerned Executive Engineer. iii Experience Certificate approved through e-GP system will be preferred. |
The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in procurement of Works works of at least 01 (one) contract of similar nature of works, (Wooden & Steel furniture) i.e. any Wooden & Steel furniture manufacture successfully completed within the last 05 years with a value of at least BDT Tk 74 Lacs of Government/ Semi-Government/ Autonomous Bodies in Bangladesh. i.e. years counting backward from the date of publication of IFT in the e-GP System. The above experience/ work completion certificate shall have to be submitted as follows:
i In case of the work done under PWD, the certifying and authenticating authority shall be the concerned Executive Engineer. iii Experience Certificate approved through e-GP system will be preferred. |
| TDS/PDS--D. Tender Preparation-- | Tenderer shall submit with its Tender, the following additional documents:
(a). The minimum number of years of general experience of the Tenderer to manufacture wooden and steel furniture works shall be minimum Five (05) years.
(b). The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in procurement of works of at least 01 (one) contract of similar nature of works, (Wooden & Steel furniture) i.e. any Wooden & Steel furniture manufacture successfully completed within the last 05 years with a value of at least BDT Tk 70.00 Lacs of Government/ Semi-Government/ Autonomous Bodies in Bangladesh. i.e. years counting backward from the date of publication of IFT in the e-GP System. The above experience/ work completion certificate shall have to be submitted as follows: iii Experience Certificate approved through e-GP system will be preferred.
(c). The Tenderer shall have minimum amount of liquid assets BDT TK 65.00 lacs i.e. working capital or credit line(s), net of other contractual commitments at the time of Tender submission with the standard format of CPTU (PW2a-3) (h) Tenderer shall submit an assurance certificate declaring explicitly to perform the job within time duly. (i).Tenderer is expected to be the Member for Bangladesh Furniture Industries Owners Association (j) Rule 27(2) of PPR/2008 will be applied in case of front loading (k) Tenderer shall submit an assurance certificate declaring manufacture/ supply of qualified products. Otherwise the products to be rejected and all rejected products replacing with new demanded products by the required authority. l) Minimum supply/ production capacity (in any govt. organization/semi govt/ autonomous body/ Private Organization) of minimum 5 sets of furniture (wooden/ steel) supply/ manufacture by 5 Years, in a minimum amount of BDT TK 350.00 lacs, years counting backward from the date of publication of IFT. (Certificate of the minimum supply capacity shall be on the basis of Acceptance Certificate and Certificate of the minimum production capacity from manufacturer is allowable only.)
m) Confirmation Certificate of Warranty Period for at least One (1) year from the manufacturing company is mandatory q) The duration of working time may be extended; if the project time delayed. So that site handed over to be depended on it. r) Products will be taken care of by the contractor until authority would receive finally till the end of project (as per situation). s) No performance guarantee and retention money/ security money won't clear until authority would receive the products. t)All other required qualifications, special terms & conditions of the tender are shown in the ITT, GCC & Tender Data Sheet (TDS), Tender Documents, and PCC. u)Before submission of tender documents , selected list of required furnitures must be physically delivered to Office of the Sub Divisional Engineer, PWD E/M Wood Workshop Sub Division, Mirpur, Dhaka and delivered of sample furnitures received certificate must be signed by an officer of minimum rank of sub-divisional engineer and document must be submitted.( Mandatory) |
Tenderer shall submit with its Tender, the following additional documents:
(a). The minimum number of years of general experience of the Tenderer to manufacture wooden and steel furniture works shall be minimum Five (05) years.
(b). The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in procurement of works of at least 01 (one) contract of similar nature of works, (Wooden & Steel furniture) i.e. any Wooden & Steel furniture manufacture successfully completed within the last 05 years with a value of at least BDT Tk 74 Lacs of Government/ Semi-Government/ Autonomous Bodies in Bangladesh. i.e. years counting backward from the date of publication of IFT in the e-GP System. The above experience/ work completion certificate shall have to be submitted as follows: iii Experience Certificate approved through e-GP system will be preferred.
(c). The Tenderer shall have minimum amount of liquid assets BDT TK 69 lacs i.e. working capital or credit line(s), net of other contractual commitments at the time of Tender submission with the standard format of CPTU (PW2a-3) (h) Tenderer shall submit an assurance certificate declaring explicitly to perform the job within time duly. (i).Tenderer is expected to be the Member for Bangladesh Furniture Industries Owners Association (j) Rule 27(2) of PPR/2008 will be applied in case of front loading (k) Tenderer shall submit an assurance certificate declaring manufacture/ supply of qualified products. Otherwise the products to be rejected and all rejected products replacing with new demanded products by the required authority. l) Minimum supply/ production capacity (in any govt. organization/semi govt/ autonomous body/ Private Organization) of minimum 5 sets of furniture (wooden/ steel) supply/ manufacture by 5 Years, in a minimum amount of BDT TK 370.00 lacs, years counting backward from the date of publication of IFT. (Certificate of the minimum supply capacity shall be on the basis of Acceptance Certificate and Certificate of the minimum production capacity from manufacturer is allowable only.)
m) Confirmation Certificate of Warranty Period for at least One (1) year from the manufacturing company is mandatory q) The duration of working time may be extended; if the project time delayed. So that site handed over to be depended on it. r) Products will be taken care of by the contractor until authority would receive finally till the end of project (as per situation). s) No performance guarantee and retention money/ security money won't clear until authority would receive the products. t)All other required qualifications, special terms & conditions of the tender are shown in the ITT, GCC & Tender Data Sheet (TDS), Tender Documents, and PCC. u)Before submission of tender documents , selected list of required furnitures must be physically delivered to Office of the Sub Divisional Engineer, PWD E/M Wood Workshop Sub Division, Mirpur, Dhaka and delivered of sample furnitures received certificate must be signed by an officer of minimum rank of sub-divisional engineer and document must be submitted.( Mandatory) |
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Official Cost estimae is corrected as per the demand of owner agency. |
| Field Name | Old Value | New Value |
|---|---|---|
| Eligibility of Consultant |
|
|
| Brief Description of Goods,Works or Service | Manufacturing, Supplying, Fitting & Fixing of Furniture for National Institute of ENT, Tejgaon, Dhaka. (2nd Phase) |
Manufacturing, Supplying, Fitting & Fixing of Furniture for National Institute of ENT, Tejgaon, Dhaka. (2nd Phase) |
| Tender/Proposal Security (Amount in BDT)(Lot No : 1) | 235000.0 | 250000 |
| Amendment / Corrigendum/ Addendum No. : | 1 | ||||
| S. No. | File Name | File Description | File Size (in KB) |
||
|---|---|---|---|---|---|
| 1 | CamScanner 05-18-2025 16.04.pdf | Updated Official cost estimate | 520222 | ||