SSSWRDP/Cha/WD-358/2024-25 Estimate for the Laying of 1-315mm dia uPVC Buried Pipe Main Line Main Line C Point farmer Alom Land To Chechnina Darapar (C-C1, Length=350m), Main Line C Point farmer Alom Land To Bakkar Ali Land (C-C2, Length=100m), Main Line D Point Gate Valve side To farmer Mojibor Rahman land (D-D1, Length=600m), Main Line G Point (Ch.2+765km of main line) To Nachol Pahapur Road South Side Mango Garden (G-H, Length = 450m), Beel singri to South side of Farmer Nabirul Land (L-L1, Length=600m), farmer Jakkar Ali Land To East Side of Farmer Habibur Rahman Land (J-J3, Length = 400m), & J1 Point to South Side of Shofiqul Land (J1-J4, Length=200m) (Total Length 2700m) with Ancillary Works Under Chechinia Cad Sub-Project (SP No: 25197) under Sadar Upazila, Dist: Chapainawabganj.