| Brief Description of Works : |
Name of Sub-Project: Construction of 3912.00m RCC Drains in 7 Locations, including 22.00m Protection Works (Palisading) at Naohata Pourashava, District: Rajshahi.
1. Construction of RCC Drain starting from near Naohata T&T Para Halim Land to existing Main Drain via ATM Memorial (Ch.00 to 475m), Link (i): Starts from Pintu House to Link Drain (Ch.00 to 182m), Total Length=657.00m, 2. Construction of RCC Drain starting from Naohata Madrasha Para Salam House to existing Main Drain via Ali Hazi Mosque (Ch.00 to 370m), Total Length=370m, 3. Construction of RCC Drain Starts from Vogruil Bottola Mour to Proposed drain D-272 via Moddhopara Mosque Part-A,(Ch.325 to 950m),& Part-B,(Ch.00 to 325m) Total Length = 950 m, 4. Construction of RCC Drain starting from Vogruil Dalan to existing Bathan Bari Outfall Part-A,(Ch.538 to 1169m) & Part-B,(Ch.100 to 375m) Total Length=906m, 5. Construction of RCC Drain starting from Vogruil Graveyard to existing drain (Ch.250 to 475m), Total Length=225m, 6. Construction of RCC Drain starting from near Putiyapara East Para Monar Garage to existing Drain via East Putiyapara Jame Mosque (Ch.00 to 459m), Total Length= 459m, 7. Construction of RCC Drain from near Shialbed house of Zoban existing RCC Drain to Doyar Bridge (Doyar Shaku Canal) (Ch.550 to 895m), Total length = 345m under Naohata Paurashava, Disrict Rajshahi.
|