1) The Tenderer must have a minimum of 5 (Five) Years of General Experience of the Tenderer in the Establishment of Electrical Equipments as Prime Contractor or Subcontractor or Management Contractor of any Govt./Semi-Govt./ Autonomous Organization. (Copy of the completion certificate and work order must be submitted)
2) The minimum Specific Experience as a Prime Contractor or Subcontractor or Management Contractor in Establishment of 300 KVA Electrical Substation and 5 KWP Solar System at least 1(one) number contract(s) of similar nature, complexity and methods/construction technology successfully completed within the last 5 (Five) years experience in any Govt/Semi-Govt./ Autonomous Organization, each with a value of at least Tk. 55.00 Lakh. (Along with the work order and completion certificate should be enclosed).
3) Certificate of specific work experience obtained from organization other than EED should be authenticated by the Executive Engineer of EED after verified by respective organization.
4) The required average annual Turnover shall be greater than Tk 60.00 Lakh over the last 05 (Five) years.
5) The minimum amount of Liquid Assets or working capital or credit facilities of the Tenderer shall be Tk 35.00 Lakh. (In the Form PG3-8) in original form.
6) Manufacturing Authorization of Substation and Solar System to be submitted with tender.
7) According to Letter No-21.00.0000.364.19.018(1).19-14 date: 13/01/2020 & According to Letter No-21.00.0000.363.27. 114(2).19-003, date: 12/01/2023 from CPTU; The contractor who has not completed his/her work/works within schedule stipulated time by ensuring the quality without any acceptable reason, will not to be considered as a qualified tenderer for this tender notice.
8) Other Criteria are Stated in TDS & PCC.
N.B: Years counting backward from the date of publication of IFT in the newspaper.
|