As per tender documents.
At SSAE/WAY/LKM Section : Maintenance of MG steel sleeper track including overhauling of track, changing of damaged wooden sleepers at points & crossing, supplying of p-way fittings and fastening, ballasting with other related works at Modhuroad station loop line no.02 length 1826 feet-0 inch and Shahatali station loop line no.01 length 1844 feet-0 inch Total = 3670 feet-0 inch ( 1.118 km) in between LKM-CDR section