View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 2
|
|
| Amendment / Corrigendum Text : | Amendment No. 2 : Please ignore the Amendment No.1 and follow the Amendment No. 2; PE has made the following Amendmet No.2 : 1) Minimum Liquid Assets will be Tk.82.00 lac instead of Tk.243.00 lac 2) Avg. Annual Construction Turn Over will be Tk.322.00 lac instead of Tk.977.00 lac 3) Time for work completion will be 365 days instead of 120 days. |
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | PE has made the following Amendment: 1) Minimum liquid assets will be Tk.82.00 lac insted of Tk.243.00 lac. 2) Avg. annual construction turn over will be Tk.322.00 lac insted of Tk.977.00 lac. 3) Time for work completion will be 365 days insted of 120 days. |