1The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 05 (Five) years. The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least 01 (One) contract(s) of similar nature, complexity and methods/construction technology successfully completed within the last 05 (Five) years, each with a value of at least Tk. 60,00,000.00 (Taka Sixty Lac). [Years counting backward from the date of publication of IFT in the newspaper] The required average annual construction turnover shall be greater than Tk 85,00,000.00 (Taka Eighty Five lac) over the last 05 (Five) years.
Therefore the minimum required liquid asset will be Tk.2500000.00(Twenty five lacs) .
Construction of Kendua Union Parishad Complex Bhaban including Furniture Supply.