View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Correction in BOQ item description. |
| Field Name | Old Value | New Value |
|---|---|---|
| Eligibility of Consultant | 1. All the tenderers/firms must be registered with CPTU through e-GP portal. 2. All individual(s)/firm(s)/ who fulfill the qualification(s) criteria as stipulated in the Tender Data Sheet (TDS) except the firm that has been determined to be ineligible by BWDB or any other government organization. Special Instruction: 1. The work may be totally dropped, decreased or increased. No claim or extra rate will be entertained for cancellation of the tender or issuance of work order with decreased quantity of work. 5. The contractor has to keep video and image records of the work in different stages (before starting, during and after completion) at his own cost and submit the same to the office of Executive Engineer. 6. The cost of all tests (compressive strength, materials test etc.) should be carried by the Contractor himself. 7. Validity of approved project duration is up to December, 2025 till now. Time allotted for the completion of this contract will be based on approval of extension proposal of the project by competent authority. |
1. All the tenderers/firms must be registered with CPTU through e-GP portal. 2. All individual(s)/firm(s)/ who fulfill the qualification(s) criteria as stipulated in the Tender Data Sheet (TDS) except the firm that has been determined to be ineligible by BWDB or any other government organization. Special Instruction:
1. The work may be totally dropped, decreased or increased. No claim or extra rate will be entertained for cancellation of the tender or issuance of work order with decreased quantity of work. 5. The contractor has to keep video and image records of the work in different stages (before starting, during and after completion) at his own cost and submit the same to the office of Executive Engineer. 6. The cost of all tests (compressive strength, materials test etc.) should be carried by the Contractor himself. 7. Validity of approved project duration is up to December, 2025 till now. Time allotted for the completion of this contract will be based on approval of extension proposal of the project by competent authority. |
| Brief Description of Goods,Works or Service | Construction of 2-Vent (Vent Size-2.00m x 2.00m) Regulator with Boatpass on Goruluda Khal in-connection with "Flood Control, Drainage and Irrigation Project at Patiya Upazilla in Chittagong District" at Kolagaon Union, Upazilla: Patiya, Dist. Chattogram under Chattogram WD Division-1, BWDB, Chattogram. |
Construction of 2-Vent (Vent Size-2.00m x 2.00m) Regulator with Boatpass on Goruluda Khal in-connection with "Flood Control, Drainage and Irrigation Project at Patiya Upazilla in Chittagong District" at Kolagaon Union, Upazilla: Patiya, Dist. Chattogram under Chattogram WD Division-1, BWDB, Chattogram. |