| PCC 5. Documents Forming the Contract and the order of precedencei.Documents
|
| Other documents forming part of the Contract |
|---|
| In addition to the submission of above mentioned documents, the tenderer must comply with the following conditions: After the contract, the goods will be received by multiple work orders in different times and amount around the year as per the need of PE. There will not be single order at a time. The necessary goods will be procured from time to time from the approved contractors/suppliers after signing the contract within 28 (Twenty-Eight) months starting from the commencement date using a Framework Contract as per the demand of the PE by issuing a call-off order. The authority may modify/cancel the call-off order, and the decision of the PE/necessity of the PE will be final other than the suppliers' will or demand. All the goods must be supplied within the time frame of the call-off order, at the time, or according to the direction of PE. The contractor will have to supply goods according to the work order and will have to submit two copies of the bills along with the chalan. The govt. dues will be deducted from that bill. | |
| Other documents forming part of the Contract |
|---|
| In addition to the submission of above mentioned documents, the tenderer must comply with the following conditions: After the contract, the goods will be received by multiple work orders in different times and amount around the year as per the need of PE. There will not be single order at a time. The necessary goods will be procured from time to time from the approved contractors/suppliers after signing the contract within 28 (Twenty-Eight) months starting from the commencement date using a Framework Contract as per the demand of the PE by issuing a call-off order. The authority may modify/cancel the call-off order, and the decision of the PE/necessity of the PE will be final other than the suppliers' will or demand. All the goods must be supplied within the time frame of the call-off order, at the time, or according to the direction of PE. The contractor will have to supply goods according to the work order and will have to submit two copies of the bills along with the chalan. The govt. dues will be deducted from that bill. Any damage or loss Due to use of this products must be recovered by the tenderer. | |
| TDS/PDS--D. Tender Preparation--
|
The Tenderer shall submit with its e-Tender the following additional documents:
a) Updated Trade License, TIN Certificate with Tax Clearance Certificate, BIN Number.
b) Original Manufacturer’s Authorization Letter is required for all items of goods.
c) Drug Administration License / Category 1 and / Category 2 License is required for Each Product (Where Necessary).
d) Valid Annexure, price List and Literature by Drug administration.
e) Tenderers have to submit Original Catalogue/ Brochure of Each Product compiling the technical specification with Full Description of Goods.
f) Sample of Each Product (Available pack size in Market) Should be submitted to the PE office, Building No-2, Room No-601, Department of Livestock Services, Farmgate, Dhaka, before the deadline for tender submission. |
The Tenderer shall submit with its e-Tender the following additional documents:
a) Updated Trade License, TIN Certificate with Tax Clearance Certificate, BIN Number.
b) Original Manufacturer’s Authorization Letter is required for 1-15 items of goods ( Manufacturers Authorization is not required for item no. 16 of goods ).
c) Drug Administration License / Category 1 and / Category 2 License is required for Each Product (Where Necessary).
d) Valid Annexure, price List and Literature by Drug administration.
e) Tenderers have to submit Original Catalogue/ Brochure of Each Product compiling the technical specification with Full Description of Goods.
f) Sample of Each Product (Available pack size in Market) Should be submitted to the PE office, Building No-2, Room No-601, Department of Livestock Services, Farmgate, Dhaka, before the deadline for tender submission.
|
| TDS/PDS--D. Tender Preparation--
|
Manufacturer’s Authorisation is required for all items of goods. |
Manufacturer’s Authorization Letter is required for items no. 1-15 of goods.
|
| Brief Description of Goods,Works or Service
|
Procurement of Antibiotics for animal and Poultry Under framework contract at ILDP in Riverine Char Areas of Manikganj, Dhaka, Munsiganj, Rajbari, Faridpur, Madaripur and Shariatpur Districts, DLS
|
Procurement of Antibiotics for animal and Poultry Under framework contract at ILDP in Riverine Char Areas of Manikganj, Dhaka, Munsiganj, Rajbari, Faridpur, Madaripur and Shariatpur Districts, DLS
|