The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 05(five) years. i.e. years counting backward from the date of publication of IFT in the News Paper. The minimum specific experience as a Prime Contractor in construction works of at least one (1) number of similar contract completed during last 5 (five) years: (i) Similar nature of work means completion of multi-storied building with R.C. frame structure & Pile foundation work valued Tk. 1430.00 lakh in a single Contract under Public fund. This is to be supported by work order/NOA and completion certificate. The Tenderer should have ABC Electrical License. In case of JVCA any of the partners should have the ABC Electric License.
(ii) Private Works or works done by any Developer or Real Estate Company will not be considered.
(iii) All documents submitted should be sealed & signed by the tenderer.
(iv) The Procuring Entity or his authorized officer at his discretion reserves the right to visit the building of similar nature of works for verification, if required. The required average annual Construction turnover shall be minimum Tk.1800.00 lakh over the period of last 05 (Five) years i,e years counting backward from the date of publication of IFT in the news paper. Average annual Construction turnover i,e total certified payments received for contracts in progress or completed under public sector shall only be considered. Private works shall not be considered.
i. Construction of 4(four) Storied Academic Building with 5 (five) Storied Pre-cast pile Foundation. ii. Construction of 4(four) Storied Hostel Building with 5 (five) Storied Pre-cast pile Foundation. iii. Construction of 1(one) Storied 1(one) unit 1500 sft Quarter with 2(two) Storied Pre-cast pile Foundation iv. Construction of 4(four) Storied 8(eight) unit 1000 sft Quarter with 5 (five) Storied Pre-cast pile Foundation. v. Construction of 4(four) Storied 8(eight) unit 600 sft Quarter with 5 (five) Storied Pre-cast pile Foundation. vi. Construction of 2(two) Storied Garage cum Driver Quarter. vii. Construction of Pump House, LT switch Gear Room. viii. Construction of Guard Room. ix. External Works: Site Development, Surface Drain, Internal Road, Boundary wall, Arboriculture, Deep Tube-well with External Electrification and Ancillary Works.