The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 05(five) years. i.e. years counting backward from the date of publication of IFT in the News Paper. The minimum specific experience as a Prime Contractor in construction works of at least one (1) number of similar contract completed during last 5 (five) years: (i) Similar nature of work means completion of multi-storied building with R.C. frame structure & Pile foundation work valued Tk.1560.00 lakh in a single Contract under Public fund. This is to be supported by work order/NOA and completion certificate. The Tenderer should have ABC Electrical License. In case of JVCA any of the partners should have the ABC Electric License.
(ii) Private Works or works done by any Developer or Real Estate Company will not be considered.
(iii) All documents submitted should be sealed & signed by the tenderer.
(iv) The Procuring Entity or his authorized officer at his discretion reserves the right to visit the building of similar nature of works for verification, if required. The required average annual Construction turnover shall be minimum Tk. 1500.00 lakh over the period of last 05 (Five) years i,e years counting backward from the date of publication of IFT in the news paper. Average annual Construction turnover i,e total certified payments received for contracts in progress or completed under public sector shall only be considered. Private works shall not be considered.
i. Construction of 5(five) Storied 1500 sft Quarter with 5(five) Storied Pre-cast pile Foundation ii. Construction of 5(five) Storied 1250 sft Quarter with 5(five) Storied Pre-cast pile Foundation iii. Construction of 5(five) Storied 10(ten) unit Nurses Dormitory with 5 (five) Storied Pre-cast pile Foundation. iv. Construction of 5(five) Storied 10(ten) unit Class-II & III Dormitory with 5 (five) Storied Pre-cast pile Foundation. v. Construction of 2(two) Storied Garage cum Driver Quarter with footing Foundation. vi. Construction of Sub-Station with footing Foundation. vii. Vertical extension of OPD Building 2nd floor (Partly), 3rd & 4th floor. viii. Vertical extension of Hospital Building 1st floor. ix. Vertical extension of MO & Consultant Dormitory 2nd floor 8(eight unit). x. Supply, fitting & fixing of Central Medical gas pipe line system. xi. Supply & installation of List and related works. xii. Repair & Renovation of existing facilities. xiii. External Works: Site Development, Surface Drain, Boundary wall, Internal Road (RCC), Arboriculture, External Electrification and Ancillary Works.