01. A satisfactory completion of Civil / Electrical Works in the 132 kv Switchyard at least Tk. 05 (Five) Lacs under maximum 01(One) of the contract over a period of 03 (three) years shall be required.
02. As Stated in the Tender Documents.
Cutting of grass, shrubs, jungles at different grid substation under GMD, Power Grid, Rangpur.