As per TDS
LGCRRP/BHALUKA/2025-2026/12 (1) Construction of RCC pipe drain starting from Dhaka Mymensingh high way to Bhaluka Pilot high school ward no. 02 Ch. 00-140m
(2) Repair B.C road starting from Bhaluka Health complex to west side end of poura boundary (Satenga road) l Ch. 00-310 ward no. 01
(3) Rehabilitation of BC road starting from Dhaka Mymensingh high way to Bhaluka Pilot high school ward no. 02 Ch. 00-140m
(4) Construction RCC X-drain near Sujon Mia house at Bhaluka Health complex to west side end of poura boundary (Satenga road) l Ch. 00-23.8m ward no. 01under Bhaluka pourashava.