| Field Name |
Old Value |
New Value |
| Document last selling date & time
|
08/12/2025 12:00 |
14/12/2025 12:00 |
| Opening Date & Time
|
08/12/2025 13:10 |
14/12/2025 13:10 |
| Last date & time for Tender/Proposal Security Submission
|
08/12/2025 12:30 |
14/12/2025 12:30 |
| Closing Date & Time
|
08/12/2025 13:10 |
14/12/2025 13:10 |
| TDS/PDS--C. Qualification Criteria--
|
The required average annual construction turnover under public sector shall be greater than Tk 125.00 lac over the last 05(Five) financial years or best 05(Five) years in the last 10(Ten) Financial years.
i) Average Annual Construction Turnover will be calculated on the basis of Payment Certificates issued by respective authority.
ii) Only Payment Certificate will be considered in calculating turnover, Except payment certificate, no other documents/certificate will be considered for
turnover calculation.
iii) The tenderer shall submit Turn-Over Calculation sheet (Both hard copy and Excel sheet soft copy as per attached format in section 8, Particular
Specifications).
iv) In Case of JVCA, Payment certificate supporting for turnover must be mentioned the share of each partner supported by JVCA Agreement. If the JV
agreement/certificate is not provided, this certificate will not be considered for turn-over calculation.
v) Consider bill payment related to Construction only.
vi) Consider bill payment related to Public Sector Construction Works.
vii) No Audit Report will be considered for turnover calculation.
viii) All unreadable and unclear documents will be rejected. |
The required average annual construction turnover under public sector shall be greater than Tk 70.00 lac over the last 05(Five) financial years or best 05(Five) years in the last 10(Ten) Financial years.
i) Average Annual Construction Turnover will be calculated on the basis of Payment Certificates issued by respective authority.
ii) Only Payment Certificate will be considered in calculating turnover, Except payment certificate, no other documents/certificate will be considered for
turnover calculation.
iii) The tenderer shall submit Turn-Over Calculation sheet (Both hard copy and Excel sheet soft copy as per attached format in section 8, Particular
Specifications).
iv) In Case of JVCA, Payment certificate supporting for turnover must be mentioned the share of each partner supported by JVCA Agreement. If the JV
agreement/certificate is not provided, this certificate will not be considered for turn-over calculation.
v) Consider bill payment related to Construction only.
vi) Consider bill payment related to Public Sector Construction Works.
vii) No Audit Report will be considered for turnover calculation.
viii) All unreadable and unclear documents will be rejected.
|
| Field Name |
Old Value |
New Value |
| TDS/PDS--C. Qualification Criteria--
|
i) The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works under public sector of at least 05(Five) contract(s) of "SBST Works" successfully completed within the last 05(Five) years, each with a value of at least Tk. 60.00 lac.
ii) The Tenderer must submit with the tender the above mentioned work certificates from the concerned Executive Engineer/Project Manager/Project
Director.
In case of the experience in Roads and Highways Department in Bangladesh the attested copy of the requisite certificate for experience as stated above shall be from
concerned Executive Engineer/Project Manager/Project Director of Roads and Highways Department and shall be submitted along with tender.
In case of the experience in an organization other than Roads and Highways Department in Bangladesh, the above mentioned certificate shall be from the concerned
Executive Engineer/Project Manager/Project Director and the same certificate shall also be examined and countersigned by the Executive Engineer, RHD where the
work has been constructed. The Original or attested copy of the above certificate is acceptable.
Note :
(i) The work certificate(s) shall clearly state:
(a) Name of work.
(b) Name of the contractor
(c) Location of the work
(d) Date of signing the contract
(e) Time for completion of the work as per contract agreement.
(f) Value of the work as per contract agreement.
(g) Value of the work after completion.
(h) Date of actual completion.
(i) Quantity of completed Rigid Pavement
(j) The tenderer must submit with the tender the above-mentioned work certificate(s) from the concerned Executive Engineer or Project Manager or Project
Director or appropriate authority.
(k) In case of JVCA the partner in charge (Lead Partner) of JVCA must have the above experience to participate in the tender |
i) The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works under public sector of at least 01(One) contract(s) of "SBST Works" successfully completed within the last 05(Five) years, each with a value of at least Tk. 60.00 lac.(Years will be counted backward from the date of publication of tender in e-GPsystem).
Note:
1. Years will be counted backward from the date of publication of IFT in the e-GP website.
2. Tenderers are requested to read the "Information for Tenderer" section of the Notice (IFT) of this tender and follow the instructions mentioned strictly.
3. Partial/incomplete certificates shall not be accepted.
4. The work Completion certificate shall clearly state (a) Priced BoQ of done works (b) Final Bill Amount (c) Date of Commencement (d) Actual Date of Completion etc.
5. The work certificate(s) shall clearly state:
(a) Name of work.
(b) Name of the contractor
(c) Location of the work
(d) Date of signing the contract
(e) Time for completion of the work as per contract agreement.
(f) Value of the work as per contract agreement.
(g) Value of the work after completion.
(h) Date of actual completion.
(i) The tenderer must submit with the tender the above-mentioned work certificate(s) from the
concerned Executive Engineer or Project Manager or ProjectDirector or appropriate authority.
(j) In case of JVCA the partner in charge of JVCA must have the above experience to
participate in the tender.
|
| TDS/PDS--C. Qualification Criteria--
|
Maximum number of partners in the JV shall be [N/A]
The minimum qualification requirements of Lead Partner, other Partner(s) and requirements by summation of a JV shall be as follows:
|
ITT Clauses Reference |
Requirements by summation |
Requirements for Leading Partner |
Requirements for other partner(s) |
|
ITT-13.1(a) |
Summation not applicable |
Same as stated in TDS |
Same as for Leading Partner
|
|
ITT-13.1(b) |
100% (summation of different contracts) |
The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works under public sector of at least 05(Five) contract(s) of "SBST Works" successfully completed within the last 05(Five) years, each with a value of at least Tk. 60.00 lac. |
N/A |
|
ITT-14.1(b) |
100% |
40% |
25% |
|
ITT-14.1(c) |
100% |
40% |
25% |
|
ITT-15.1 |
100% |
Minimum requirement not applicable |
Minimum requirement not applicable |
|
ITT-16.1 |
100% |
Minimum requirement not applicable |
Minimum requirement not applicable |
|
ITT-17.5 |
100% |
Maximum among the Partners |
Minimum 25% |
[it is suggested that the Procuring Entity adheres to the above proportion of minimum qualifying requirements to meet the specific procurement needs. Percent share of business of the JV partners shall not be considered in determining the qualifications of a JV] |
Maximum number of partners in the JV shall be [N/A]
The minimum qualification requirements of Lead Partner, other Partner(s) and requirements by summation of a JV shall be as follows:
|
ITT Clauses Reference |
Requirements by summation |
Requirements for Leading Partner |
Requirements for other partner(s) |
|
ITT-13.1(a) |
Summation not applicable |
Same as stated in TDS |
Same as for Leading Partner
|
|
ITT-13.1(b) |
100% (summation of different contracts) |
The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works under public sector of at least 01(One) contract(s) of "SBST Works" successfully completed within the last 05(Five) years, each with a value of at least Tk. 60.00 lac |
N/A |
|
ITT-14.1(b) |
100% |
40% |
25% |
|
ITT-14.1(c) |
100% |
40% |
25% |
|
ITT-15.1 |
100% |
Minimum requirement not applicable |
Minimum requirement not applicable |
|
ITT-16.1 |
100% |
Minimum requirement not applicable |
Minimum requirement not applicable |
|
ITT-17.5 |
100% |
Maximum among the Partners |
Minimum 25% |
[it is suggested that the Procuring Entity adheres to the above proportion of minimum qualifying requirements to meet the specific procurement needs. Percent share of business of the JV partners shall not be considered in determining the qualifications of a JV]
|
| Field Name |
Old Value |
New Value |
| Eligibility of Consultant
|
As per TDS & ITT.
|
As per TDS & ITT.
|
| TDS/PDS--C. Qualification Criteria--
|
The minimum number of years of general experience of the Tenderer in the construction works as a Prime Contractor shall be 05(Five) years.Experience as a Subcontractor or Management Contractor will not be considered for this tender. |
The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 05(Five) years.
|
| TDS/PDS--C. Qualification Criteria--
|
13.1(b) The minimum Specific Experience: As a Prime Contractor only. Experience as a Subcontractor or Management Contractor will not be considered for
this tender:
i) The Tenderer must have the experience of SBST works of value not Less than Tk.60.00 Lac successfully completed within the last Five(5) years in a single contract of similar nature and complexity.
ii) The Tenderer must submit with the tender the above mentioned work certificates from the concerned Executive Engineer/Project Manager/Project
Director.
In case of the experience in Roads and Highways Department in Bangladesh the attested copy of the requisite certificate for experience as stated above shall be from
concerned Executive Engineer/Project Manager/Project Director of Roads and Highways Department and shall be submitted along with tender.
In case of the experience in an organization other than Roads and Highways Department in Bangladesh, the above mentioned certificate shall be from the concerned
Executive Engineer/Project Manager/Project Director and the same certificate shall also be examined and countersigned by the Executive Engineer, RHD where the
work has been constructed. The Original or attested copy of the above certificate is acceptable.
Note :
(i) The work certificate(s) shall clearly state:
(a) Name of work.
(b) Name of the contractor
(c) Location of the work
(d) Date of signing the contract
(e) Time for completion of the work as per contract agreement.
(f) Value of the work as per contract agreement.
(g) Value of the work after completion.
(h) Date of actual completion.
(i) Quantity of completed Rigid Pavement
(j) The tenderer must submit with the tender the above-mentioned work certificate(s) from the concerned Executive Engineer or Project Manager or Project
Director or appropriate authority.
(k) In case of JVCA the partner in charge (Lead Partner) of JVCA must have the above experience to participate in the tender
(Years will be counted backward from the date of publication of IFT). |
i) The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works under public sector of at least 05(Five) contract(s) of "SBST Works" successfully completed within the last 05(Five) years, each with a value of at least Tk. 60.00 lac.
ii) The Tenderer must submit with the tender the above mentioned work certificates from the concerned Executive Engineer/Project Manager/Project
Director.
In case of the experience in Roads and Highways Department in Bangladesh the attested copy of the requisite certificate for experience as stated above shall be from
concerned Executive Engineer/Project Manager/Project Director of Roads and Highways Department and shall be submitted along with tender.
In case of the experience in an organization other than Roads and Highways Department in Bangladesh, the above mentioned certificate shall be from the concerned
Executive Engineer/Project Manager/Project Director and the same certificate shall also be examined and countersigned by the Executive Engineer, RHD where the
work has been constructed. The Original or attested copy of the above certificate is acceptable.
Note :
(i) The work certificate(s) shall clearly state:
(a) Name of work.
(b) Name of the contractor
(c) Location of the work
(d) Date of signing the contract
(e) Time for completion of the work as per contract agreement.
(f) Value of the work as per contract agreement.
(g) Value of the work after completion.
(h) Date of actual completion.
(i) Quantity of completed Rigid Pavement
(j) The tenderer must submit with the tender the above-mentioned work certificate(s) from the concerned Executive Engineer or Project Manager or Project
Director or appropriate authority.
(k) In case of JVCA the partner in charge (Lead Partner) of JVCA must have the above experience to participate in the tender
|
| TDS/PDS--C. Qualification Criteria--
|
The required average annual construction turnover shall be greater than Tk 125.00 Lac over the last 5 financial years.
i) Average Annual Construction Turnover will be calculated on the basis of Payment Certificates issued by respective authority.
ii) Only Payment Certificate will be considered in calculating turnover, Except payment certificate, no other documents/certificate will be considered for
turnover calculation.
iii) The tenderer shall submit Turn-Over Calculation sheet (Both hard copy and Excel sheet soft copy as per attached format in section 8, Particular
Specifications).
iv) In Case of JVCA, Payment certificate supporting for turnover must be mentioned the share of each partner supported by JVCA Agreement. If the JV
agreement/certificate is not provided, this certificate will not be considered for turn-over calculation.
v) Consider bill payment related to Construction only.
vi) Consider bill payment related to Public Sector Construction Works.
vii) No Audit Report will be considered for turnover calculation.
viii) All unreadable and unclear documents will be rejected. |
The required average annual construction turnover under public sector shall be greater than Tk 125.00 lac over the last 05(Five) financial years or best 05(Five) years in the last 10(Ten) Financial years.
i) Average Annual Construction Turnover will be calculated on the basis of Payment Certificates issued by respective authority.
ii) Only Payment Certificate will be considered in calculating turnover, Except payment certificate, no other documents/certificate will be considered for
turnover calculation.
iii) The tenderer shall submit Turn-Over Calculation sheet (Both hard copy and Excel sheet soft copy as per attached format in section 8, Particular
Specifications).
iv) In Case of JVCA, Payment certificate supporting for turnover must be mentioned the share of each partner supported by JVCA Agreement. If the JV
agreement/certificate is not provided, this certificate will not be considered for turn-over calculation.
v) Consider bill payment related to Construction only.
vi) Consider bill payment related to Public Sector Construction Works.
vii) No Audit Report will be considered for turnover calculation.
viii) All unreadable and unclear documents will be rejected.
|
| TDS/PDS--C. Qualification Criteria--
|
Maximum number of partners in the JV shall be [insert number or insert “not limited”]
The minimum qualification requirements of Lead Partner, other Partner(s) and requirements by summation of a JV shall be as follows:
|
ITT Clauses Reference |
Requirements by summation |
Requirements for Leading Partner |
Requirements for other partner(s) |
|
ITT-13.1(a) |
Summation not applicable |
Same as stated in TDS |
Same as for Leading Partner
|
|
ITT-13.1(b) |
100% (summation of different contracts) |
The Tenderer must have the experience of SBST works of value not Less than Tk.60.00 Lac successfully completed within the last Five(5) years in a single contract of similar nature and complexity |
The Tenderer must have
the experience of
SBST
work successfully
completed within the last
Five(5) years in a single
contract of similar nature
and complexity (years will
be counted backward
from the date of
publication of IFT). |
|
ITT-14.1(b) |
100% |
40% |
25% |
|
ITT-14.1(c) |
100% |
40% |
25% |
|
ITT-15.1 |
100% |
Minimum requirement not applicable |
Minimum requirement not applicable |
|
ITT-16.1 |
100% |
Minimum requirement not applicable |
Minimum requirement not applicable |
|
ITT-17.5 |
100% |
Maximum among the Partners |
Minimum 25% |
[it is suggested that the Procuring Entity adheres to the above proportion of minimum qualifying requirements to meet the specific procurement needs. Percent share of business of the JV partners shall not be considered in determining the qualifications of a JV] |
Maximum number of partners in the JV shall be [N/A]
The minimum qualification requirements of Lead Partner, other Partner(s) and requirements by summation of a JV shall be as follows:
|
ITT Clauses Reference |
Requirements by summation |
Requirements for Leading Partner |
Requirements for other partner(s) |
|
ITT-13.1(a) |
Summation not applicable |
Same as stated in TDS |
Same as for Leading Partner
|
|
ITT-13.1(b) |
100% (summation of different contracts) |
The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works under public sector of at least 05(Five) contract(s) of "SBST Works" successfully completed within the last 05(Five) years, each with a value of at least Tk. 60.00 lac. |
N/A |
|
ITT-14.1(b) |
100% |
40% |
25% |
|
ITT-14.1(c) |
100% |
40% |
25% |
|
ITT-15.1 |
100% |
Minimum requirement not applicable |
Minimum requirement not applicable |
|
ITT-16.1 |
100% |
Minimum requirement not applicable |
Minimum requirement not applicable |
|
ITT-17.5 |
100% |
Maximum among the Partners |
Minimum 25% |
[it is suggested that the Procuring Entity adheres to the above proportion of minimum qualifying requirements to meet the specific procurement needs. Percent share of business of the JV partners shall not be considered in determining the qualifications of a JV]
|
| TDS/PDS--D. Tender Preparation--
|
The required audit reports on the financial standing, such as profit and loss statements and balance sheet shall be for the past 02(Two) years. |
The required audit reports on the financial standing, such as profit and loss statements and balance sheet shall be for the past 01(One) years.
Note: The Audited Financial Report shall be verified through the Document Verification System (DVS), Supported by the corresponding Document Verification Code (DVC) issued by the Institute of Chartered Accountants of Bangladesh (ICAB).
|
| TDS/PDS--D. Tender Preparation--
|
The Tender Validity period shall be 120 days. |
The Tender Validity period shall be 120 days.
|
| TDS/PDS--D. Tender Preparation--
|
The amount of the Tender Security shall be Tk. 290000 (Two lac NinetyThousand Only) |
The amount of the Tender Security shall be Tk. 290000 (Two lac NinetyThousand Only) in favour of The Executive Engineer, RHD, Thakurgaon Road Division, Thakurgaon.
|
| Brief Description of Goods,Works or Service
|
Damaged Bitumenous pavement repaired by Carpeting, SBST & Road marking works at 45th(p) Km to 49th(P) Km of Thakurgaon-Baliadangi-Nekmorod-Ranishankail-Pirganj-Birganj Road (Z-5002) under Road Division, Thakurgaon during the year 2025-2026.
|
Damaged Bitumenous pavement repaired by Carpeting, SBST & Road marking works at 45th(p) Km to 49th(P) Km of Thakurgaon-Baliadangi-Nekmorod-Ranishankail-Pirganj-Birganj Road (Z-5002) under Road Division, Thakurgaon during the year 2025-2026.
|