| TDS/PDS--D. e-Tender Preparation--
|
1. Manufacturer/Local Agent Authorization Letter
2. Manufacturer/agent certification with validity
3. Original Laboratory Test Report: Bidders are required to submit original lab reports of the product from a Bangladeshi accredited laboratory. The report should confirm the chemical composition and efficacy of the fumigant.
4. Manufacturer’s Specification: The bid should be accompanied by the manufacturer’s original specification sheet, which should include detailed information about the composition, quality factors and country of origin of the fumigant.
5. Certificate of Registration and Approval: Bidders must provide evidence that the fumigant is registered with the appropriate national or international authority and approved for the intended use.
6. Safety Data Sheet (SDS): A complete Material Safety Data Sheet (MSDS) or Safety Data Sheet (SDS) should be included, providing information about the hazards of the chemical, handling procedures and emergency controls.
Others Conditions:
1.Third Party Testing: The Procuring Entity reserves the right to have a third-party laboratory conduct its own testing on the smoke samples submitted by the Bidder.
2. Pre-Contract Testing: The Purchaser shall ask the successful Bidder to provide a functional sample for testing and final approval before placing the purchase order.
3. Proper Labeling and Packaging: The product shall be properly packaged and labeled with the product name, active ingredient, batch number, and expiration date. Incorrectly labeled samples shall be rejected.
4. Analysis of Active Ingredients: Lab testing shall verify the concentration of the active ingredient(s) as stated by the manufacturer. Discrepancies may result in disqualification.
5. Analysis of Impurities and Contamination: The product shall be tested to ensure that it is not harmful to the environment during manufacture. Consequences of non-compliance
6. Bid Rejection: Failure to submit the required lab test reports and quality documentation will result in the bid being rejected.
7. Product Rejection: If any product fails the quality control test during the contract period, the procuring entity will reject the product and terminate the contract.
8. In additional others conditions will be added on work order. |
1. Manufacturer/Local Agent Authorization Letter
2. Manufacturer/agent certification with validity
3. Original Laboratory Test Report: Bidders are required to submit original lab reports of the product from a Bangladeshi accredited laboratory. The report should confirm the chemical composition and efficacy of the Insecticide.
4. Manufacturer’s Specification: The bid should be accompanied by the manufacturer’s original specification sheet, which should include detailed information about the composition, quality factors and country of origin of the Insecticide.
5. Certificate of Registration and Approval: Bidders must provide evidence that the Insecticide is registered with the appropriate national or international authority and approved for the intended use.
6. Safety Data Sheet (SDS): A complete Material Safety Data Sheet (MSDS) or Safety Data Sheet (SDS) should be included, providing information about the hazards of the chemical, handling procedures and emergency controls.
Others Conditions:
1.Third Party Testing: The Procuring Entity reserves the right to have a third-party laboratory conduct its own testing on the smoke samples submitted by the Bidder.
2. Pre-Contract Testing: The Purchaser shall ask the successful Bidder to provide a functional sample for testing and final approval before placing the purchase order.
3. Proper Labeling and Packaging: The product shall be properly packaged and labeled with the product name, active ingredient, batch number, and expiration date. Incorrectly labeled samples shall be rejected.
4. Analysis of Active Ingredients: Lab testing shall verify the concentration of the active ingredient(s) as stated by the manufacturer. Discrepancies may result in disqualification.
5. Analysis of Impurities and Contamination: The product shall be tested to ensure that it is not harmful to the environment during manufacture. Consequences of non-compliance
6. Bid Rejection: Failure to submit the required lab test reports and quality documentation will result in the bid being rejected.
7. Product Rejection: If any product fails the quality control test during the contract period, the procuring entity will reject the product and terminate the contract.
8. In additional others conditions will be added on work order.
|