View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Revision of Completion Time, turnover and liquid asset requirement etc |
| Field Name | Old Value | New Value |
|---|---|---|
| Completion Date(Lot No : 1) | 16/12/2018 | 16/06/2019 |
| PCC--A. General-- | The Intended Completion Date for the whole of the Works shall be - 12(twelve) month from the commence date. Note: Due to monsoon season, any type of bituminous work will remain stop during 15 June to 15 September |
The Intended Completion Date for the whole of the Works shall be - 18(eighteen) months from the date of commencement Note: Due to monsoon season, any type of bituminous work will remain stop during 15 June to 15 September |
| PCC--A. General-- | Other documents forming part of the Contract are; RHD’s Standard Tender Document, Vol 3 of 4 (Technical Specification; Published in 2016) |
Other documents forming part of the Contract are; RHD's Standard Tender Document, Section 7 (Technical Specification; Published in 2016) |
| TDS/PDS--C. Qualification Criteria-- |
15.1(a)The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be five (5) years .years counting backward from the date of publication of IFT. (b) The minimum specific experience as a Prime Contractor in construction works of at least 01 (one) contract of road works (flexible pavement) successfully completed within the last 5 (five) years, with a total contract value of at least Tk. 20.00 crore .The work must include DBS works |
15.1(a)The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be five (5) years .years counting backward from the date of publication of IFT. (b) The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least 01 (one) contract of road works (flexible pavement) successfully completed within the last 5 (five) years, with a total contract value of at least Tk. 20.00 crore .The work must include DBS works |
| TDS/PDS--C. Qualification Criteria-- |
(a) The required average annual construction turnover shall be greater than Tk 50,00,00,000.00(Tk. Fifty Crore only) over the best three (3) years in the last five (5) years. |
(a) The required average annual construction turnover shall be greater than Tk 24,00,00,000.00(Tk. Twenty Four Crore only) over the last five (5) years. |