View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 3
|
|
| Amendment / Corrigendum Text : | BoQ Changes (1000 sft) |
|
Amendment / Corrigendum No. : 2
|
|
| Amendment / Corrigendum Text : | Turnover, Liquid asset change due to change of estimate cost |
| Field Name | Old Value | New Value |
|---|---|---|
| TDS/PDS--C. Qualification Criteria-- | The required average annual construction turnover shall be greater than Tk 650.00 lac over the last 05 years.
[ the required average annual construction turn over is recommended to be about twice the estimated annual cash flow for the Contract; however the multiplier may vary from 1.0 to 2.0, the larger the Contract size the lesser the multiplier should be. The period may be best three (3) years in the last five (5) years or best five (5) years in the last ten (10) years (as appropriate) ; years counting backward from the date of publication of IFT in the newspaper]
The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk 200.00 lac
[usually the required liquid asset is the equivalent of 2-6 months payment flow at the average construction rate (straight line distribution), accessible or available after taking into account the financial requirements of existing commitments. The actual period will depend on the speed with which the PE will pay the Contractorâ??s monthly certificate, allowing time to prepare an invoice, for the Project Managerâ??s time to certify it, and at least one month contingency for preparing the cheque and making actual payment.
Therefore, the minimum required liquid asset will be Tk 4 Cr., i.e. 3 months cash flow based on the above assumptions.] |
The required average annual construction turnover shall be greater than Tk 810.50 lac over the last 05 years.
[ the required average annual construction turn over is recommended to be about twice the estimated annual cash flow for the Contract; however the multiplier may vary from 1.0 to 2.0, the larger the Contract size the lesser the multiplier should be. The period may be best three (3) years in the last five (5) years or best five (5) years in the last ten (10) years (as appropriate) ; years counting backward from the date of publication of IFT in the newspaper]
The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk 226.00 lac
[usually the required liquid asset is the equivalent of 2-6 months payment flow at the average construction rate (straight line distribution), accessible or available after taking into account the financial requirements of existing commitments. The actual period will depend on the speed with which the PE will pay the Contractor’s monthly certificate, allowing time to prepare an invoice, for the Project Manager’s time to certify it, and at least one month contingency for preparing the cheque and making actual payment.
Therefore, the minimum required liquid asset will be Tk 4 Cr., i.e. 3 months cash flow based on the above assumptions.] |
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Estimate cost, BoQ, Tender Security, Liquid Asset, Turnover, Closing Time. |
| Field Name | Old Value | New Value |
|---|---|---|
| Opening Date & Time | 03/10/2017 11:30 | 03/10/2017 17:00 |
| Last date & time for Tender/Proposal Security Submission | 03/10/2017 11:29 | 03/10/2017 16:59 |
| Closing Date & Time | 03/10/2017 11:30 | 03/10/2017 17:00 |
| Tender/Proposal Security (Amount in BDT)(Lot No : 01) | 3100000.0 | 3650000 |