| Amendment / Corrigendum Text : | ITT Clause 19.1: [TDS Clauses References ITT-15.1(b),] Requirements for Lead Partner of JVCA (Qualification Criteria) Minimum requirement in a single completed contract as follows. i) Contract value, Tk. 24.00 crore, ii) Aggregate Base Type-1 8000.00 cum, iii) DBS Base/Wearing Course=4000.00 cum, will be replaced by Minimum requirement in a single completed contract as follows. i) Contract value = Tk. 24.00 crore, ii) Aggregate Base Type-1 = 8000.00 cum, iii) DBS Base/Wearing Course = 5000.00 cum, and ITT Clause 25: Contents of Tender (Tender Preparation) has been edited with some additional features |
| Field Name | Old Value | New Value | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Eligibility of Consultant | 1. Any / All tenderers who have registraion in Government e-Gp system may participate in the tender provided they fulfil the criteria as stated in Tender Data Sheet (TDS). The Tenderer shall be evaluated based on the latest revision of PPA-2006 & PPR-2008. If the quoted price varies by more than 10.00% (above/less) of the official estimate then the tender will be rejected. Tenderer must upload Rate Analysis supporting the quoted amount, if the Total quoted Amount is more than 5% above/less than the approved official estimate. 2. As per consent of CPTU, the Tenderer shall be evaluated in the e-GP system with the help of online database system-TDMS. 3. A Tenderer not having sufficent information in the TDMS system may be evaluated as ineligible. |
1. Any / All tenderers who have registraion in Government e-Gp system may participate in the tender provided they fulfil the criteria as stated in Tender Data Sheet (TDS). The Tenderer shall be evaluated based on the latest revision of PPA-2006 & PPR-2008. If the quoted price varies by more than 10.00% (above/less) of the official estimate then the tender will be rejected. Tenderer must upload Rate Analysis supporting the quoted amount, if the Total quoted Amount is more than 5% above/less than the approved official estimate. 2. As per consent of CPTU, the Tenderer shall be evaluated in the e-GP system with the help of online database system-TDMS. 3. A Tenderer not having sufficent information in the TDMS system may be evaluated as ineligible. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- |
The value of non-judicial stamp for execution of the Joint Venture agreement shall be Tk.300.00 |
The value of non-judicial stamp for execution of the Joint Venture agreement shall be Tk.300.00 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--D. Tender Preparation-- | As per Memo no-215, CE, RHD, Date 06-08-2017 the following criteria shall be followed for tender evaluation (K) (a). As per consent of CPTU, the Tenderer shall be evaluated in the e-GP system with the help of online database system-TDMS. (b) Qualification information and evidences {such as work experience certificates, on-going works list, payment certificates for construction turnover, equipment list (own or rented), personnel list etc} of the Tenders as mapped in the e-GP Tenders must be available in the TDMS system so that TEC can evaluate the tenders digitally within short period of time.
(c). If there is any conflicting information in TDMS and e-GP, the information provided in the e-GP system shall prevail. (e) Evaluation sheet generated by TDMS shall be uploaded into the e-GP system by the TEC The Tenderer shall submit with its Tender the following additional documents:
a) Attested copy of authorized signatory’s document other than the owner of the firm.
f) Payment Certificate for supporting Annual Construction Turnover and work completion certificate for required specific experience certificate j) Tenderer must upload the rate analysis supporting the quoted amount if the total quoted amount is 5% more/less than the official estimate. k) For the calculation of tender capacity, The tenderer shall submitt the following information: i) The tenderer shall submitt documents about Maximum value of works (Tk.) performed in any one year during last five years. ii) The tenderer shall submitt documents about Value of works (Tk.) in hand. |
As per Memo no-215, CE, RHD, Date 06-08-2017 the following criteria shall be followed for tender evaluation (K) (a). As per consent of CPTU, the Tenderer shall be evaluated in the e-GP system with the help of online database system-TDMS. (b) Qualification information and evidences {such as work experience certificates, on-going works list, payment certificates for construction turnover, equipment list (own or rented), personnel list etc} of the Tenders as mapped in the e-GP Tenders must be available in the TDMS system so that TEC can evaluate the tenders digitally within short period of time.
(c). If there is any conflicting information in TDMS and e-GP, the information provided in the e-GP system shall prevail. (e) Evaluation sheet generated by TDMS shall be uploaded into the e-GP system by the TEC The Tenderer shall submit with its Tender the following additional documents:
1. a) Attested copy of authorized signatory's document other than the owner of the firm.
2. Payment Certificate for supporting Annual Construction Turnover and work completion certificate for required specific experience certificate 6. Tenderer must upload the rate analysis supporting the quoted amount if the total quoted amount is 5% more/less than the official estimate. 7. For the calculation of tender capacity, The tenderer shall submitt the following information: i) The tenderer shall submitt documents about Maximum value of works (Tk.) performed in any one year during last five years. ii) The tenderer shall submitt documents about Value of works (Tk.) in hand. 8. For Past Performance Evaluation, The tenderer shall submitt the following information: a) The tenderer shall submit documents about the Number of court cases filed and won against PE during last 5 years b) The tenderer shall submit documents about the Debarred information by PE during last 5 years c) The tenderer shall submit documents about the Termination of incomplete contract for poor performance by PE during last 5 years d) The tenderer shall submit documents about the Extension of Time beyond original contract period by PE during last 5 years e)The tenderer shall submit documents about the Imposition of Liquidity Damages (LD) by PE during last 5 years f) The tenderer shall submit documents about the Extension of contracted Defects Liability Period (DLP) by PE during last 5 years g) The tenderer shall submit documents about the Declared bankrupt during last 5 years
Note-01:If any document comprising Sl no 1, 2, 3, 4, 5, 6, 7 and 8 not submitted along with the Tender, the Tender will |