View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Corrigendum |
| Field Name | Old Value | New Value | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Eligibility of Consultant |
1) Valid Trade Licence, TIN number, VAT Registration, Nationality, & Business address, Declaration about legal capacity to enter in to the contract. 6) The concern contractor will have to arrange the required land for construction works by consulting with the local union chairman and owner of the land. The concern contractor cannot claim any additional compensation in this connection and if so; his claim will not be admissible. 7) Latest circular of BPPA and BWDB shall be implied. 8) After completion of the tender opening process, only downloaded documents of the tenderer from egp portal shall be treated as submitted documents. 9) The Contractor shall keep records of still pictures and videos of Pre-work, Ongoing work and Post work/Completion of work at his own cost. |
1) Valid Trade Licence, TIN number, VAT Registration, Nationality, & Business address, Declaration about legal capacity to enter in to the contract. 6) The concern contractor will have to arrange the required land for construction works by consulting with the local union chairman and owner of the land. The concern contractor cannot claim any additional compensation in this connection and if so; his claim will not be admissible. 7) Latest circular of BPPA and BWDB shall be implied. 8) After completion of the tender opening process, only downloaded documents of the tenderer from egp portal shall be treated as submitted documents. 9) The Contractor shall keep records of still pictures and videos of Pre-work, Ongoing work and Post work/Completion of work at his own cost. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least 01 (One) contract(s) of Excavation/Re-excavation of river/khal/canal/irrigation canal/irrigation canal/drainage canal/pond/wetland successfully completed within the last 05 (Five) years, each with a value of at least Tk. 470.00 Lakh. Years counting backward from the date of publication of IFT in the newspaper.
Note 1: For contracts under which the tenderer participated as a joint venture member or Subcontractor, only the tenderer’s share, by value, shall be considered to meet this requirement. Note 2: Completion shall be based on the completion certificate of the completed works. |
The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least 01 (One) contract(s) of Excavation/Re-excavation of river/khal/canal/irrigation canal/irrigation canal/drainage canal/pond/wetland successfully completed within the last 05 (Five) years, each with a value of at least Tk. 400.00 Lakh. Years counting backward from the date of publication of IFT in the newspaper.
Note 1: Completion shall be based on the completion certificate of the completed works. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | The required average annual construction turnover under public sector shall be greater than Tk 665.00 Lakh of the period may be best three (3) Financial years in the last five (5) Financial years.
Note 1: Certificates from supply of goods contracts shall not be considered when calculating the average annual construction turnover. |
The required average annual construction turnover under public sector shall be greater than Tk 670.00 Lakh of best three (3) Financial years in the last five (5) Financial years.
Note 1: Certificates from supply of goods contracts shall not be considered when calculating the average annual construction turnover. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- |
A Construction Project Manager, Engineer, and other key staff shall have the following qualifications and experience supported by CVs following the Form PW3-5.
|
A Construction Project Manager, Engineer, and other key staff shall have the following qualifications and experience supported by CVs following the Form PW3-5.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | Maximum number of partners in the JV shall be 02 (Two)
The minimum qualification requirements of Leading Partner, other Partner(s) and requirements by summation of a JV shall be as follows:
|
The minimum qualification requirements of Leading Partner, other Partner(s) and requirements by summation of a JV shall be as follows:
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Brief Description of Goods,Works or Service | Re-excavation of Mogra River from Km. 56.00 to Km. 61.00 = 5.00 Km in Netrokona District in c/w Resuscitation of Mogra River in Netrokona District project under Netrokona WD Division, BWDB, Netrokona during the Financial year 2025-26 & 2026-27. |
Re-excavation of Mogra River from Km. 56.00 to Km. 61.00 = 5.00 Km in Netrokona District in c/w Resuscitation of Mogra River in Netrokona District project under Netrokona WD Division, BWDB, Netrokona during the Financial year 2025-26 & 2026-27. |