View IFT /PQ / REOI / RFP / PPS Notice Details
Ministry : Ministry of Water Resources Division :
Organization : Bangladesh Water Development Board (BWDB) Procuring Entity Name : Netrokona WD Division
Procuring Entity Code : Procuring Entity District : Netrokona
Procurement Nature : Works Procurement Type : NCT
Event Type : Invitation for : Tender - Single Lot
Invitation Reference No. : T-1/1431, Date: 04-12-2025 Tender/Proposal Status :
App ID : 220686 Tender/Proposal ID : 1190171
Key Information and Funding Information :
Procurement Method : Open Tendering Method (OTM) Budget Type : Development
Source of Funds : Government
Particular Information :
Project Code : 224416200 Project Name : Resuscitation of Mogra River in Netrakona District
Tender/Proposal Package No. and Description : Netro-Mogra-exv-01/2025-26
Re-excavation of Mogra River from Km. 56.00 to Km. 61.00 = 5.00 Km in Netrokona District in c/w Resuscitation of Mogra River in Netrokona District project under Netrokona WD Division, BWDB, Netrokona during the Financial year 2025-26 & 2026-27.
Category : Construction work for water projects; Works for complete or part construction and civil engineering work;
Scheduled Tender/Proposal Publication
Date and Time :
04-Dec-2025 16:00 Tender/Proposal Document last selling /
downloading Date and Time :
28-Dec-2025 12:00
Pre - Tender/Proposal meeting Start
Date and Time :
04-Dec-2025 17:00 Pre - Tender/Proposal meeting End
Date and Time :
08-Dec-2025 16:00
Tender/Proposal Closing
Date and Time :
28-Dec-2025 13:00 Tender/Proposal Opening
Date and Time :
28-Dec-2025 13:00
Last Date and Time for Tender/Proposal Security
Submission :
28-Dec-2025 12:30    
Information for Tenderer/Consultant :
Eligibility of Tenderer :

 

1) Valid Trade Licence, TIN number, VAT Registration, Nationality, & Business address, Declaration about legal capacity to enter in to the contract.
2) Work plan, Statement of work method, Equipment & Personnel.
Special Instruction: (Please Read)
1) The work of the package may be totally dropped, decreased or increased as per field condition/design for which no claim will be entertained for cancellation of the tender/Issuance of work order.
2) Work order will be issued after obtaining budget allocation & prior approval from the competent authority of BWDB.
3) Payment will be made subject to the availability of fund. No claim in this regard will be entertained.
4) Continuation of work could not be hampered for the reason of insufficient Budget Provision & Fund Allocation. The work must be completed within the stipulated time failure of which action will be taken as per Tender Clause & PPR-2025.
5) The Procuring entity reserves the right to accept or reject any or all Tenders without assigning any reason whatsoever.

6) The concern contractor will have to arrange the required land for construction works by consulting with the local union chairman and owner of the land. The concern contractor cannot claim any additional compensation in this connection and if so; his claim will not be admissible.

7) Latest circular of BPPA and BWDB shall be implied.

8) After completion of the tender opening process, only downloaded documents of the tenderer from egp portal shall be treated as submitted documents.

9) The Contractor shall keep records of still pictures and videos of Pre-work, Ongoing work and Post work/Completion of work at his own cost.

Brief Description of Works :

Re-excavation of Mogra River from Km. 56.00 to Km. 61.00 = 5.00 Km in Netrokona District in c/w Resuscitation of Mogra River in Netrokona District project under Netrokona WD Division, BWDB, Netrokona during the Financial year 2025-26 & 2026-27.

Evaluation Type : Lot wise
Document Available : Package wise
Document Fees : Package wise
Tender/Proposal Document Price (In BDT) : 4000
Mode of Payment :
Tender/Proposal Security Valid Up to : 24-Jun-2026
Tender/Proposal Valid Up to : 27-May-2026
Lot No. Identification of Lot Location Tender/Proposal security
(Amount in BDT)
Tentative Start Date Tentative Completion Date
Netro-Mogra-exv-01/2025-26 Re-excavation of Mogra River from Km. 56.00 to Km. 61.00 = 5.00 Km in Netrokona District in c/w Resuscitation of Mogra River in Netrokona District project under Netrokona WD Division, BWDB, Netrokona during the Financial year 2025-26 & 2026-27. Netrokona sadar 2100000 01-Feb-2026 31-Mar-2027
Procuring Entity Details:
Name of Official Inviting Tender/Proposal : Md. Shakhawat Hossain Designation of Official Inviting Tender/Proposal : Executive Engineer
Address of Official Inviting Tender/Proposal :
Address: Netrokona
City: Netrokona
Thana: Netrakona Sadar
District: Netrokona - 2400
Country: Bangladesh
Contact details of Official Inviting Tender/Proposal :
Phone No: 0951-61464
Fax No:
The procuring entity reserves the right to accept or reject all Tenders/Proposals / Pre-Qualifications / EOIs
Note: Bank will update the payment transactions only at the end of the day, so the tenderers should make sure the securities and other payments are made at least one day before the submission date.
Documents
Amendment / Corrigendum Detail
 Amendment / Corrigendum No. :  1 
Amendment / Corrigendum Text :

Corrigendum

Field Name Old Value New Value
Eligibility of Consultant

 

1) Valid Trade Licence, TIN number, VAT Registration, Nationality, & Business address, Declaration about legal capacity to enter in to the contract.
2) Work plan, Statement of work method, Equipment & Personnel.
Special Instruction: (Please Read)
1) The work of the package may be totally dropped, decreased or increased as per field condition/design for which no claim will be entertained for cancellation of the tender/Issuance of work order.
2) Work order will be issued after obtaining budget allocation & prior approval from the competent authority of BWDB.
3) Payment will be made subject to the availability of fund. No claim in this regard will be entertained.
4) Continuation of work could not be hampered for the reason of insufficient Budget Provision & Fund Allocation. The work must be completed within the stipulated time failure of which action will be taken as per Tender Clause & PPR-2025.
5) The Procuring entity reserves the right to accept or reject any or all Tenders without assigning any reason whatsoever.

6) The concern contractor will have to arrange the required land for construction works by consulting with the local union chairman and owner of the land. The concern contractor cannot claim any additional compensation in this connection and if so; his claim will not be admissible.

7) Latest circular of BPPA and BWDB shall be implied.

8) After completion of the tender opening process, only downloaded documents of the tenderer from egp portal shall be treated as submitted documents.

9) The Contractor shall keep records of still pictures and videos of Pre-work, Ongoing work and Post work/Completion of work at his own cost.

 

1) Valid Trade Licence, TIN number, VAT Registration, Nationality, & Business address, Declaration about legal capacity to enter in to the contract.
2) Work plan, Statement of work method, Equipment & Personnel.
Special Instruction: (Please Read)
1) The work of the package may be totally dropped, decreased or increased as per field condition/design for which no claim will be entertained for cancellation of the tender/Issuance of work order.
2) Work order will be issued after obtaining budget allocation & prior approval from the competent authority of BWDB.
3) Payment will be made subject to the availability of fund. No claim in this regard will be entertained.
4) Continuation of work could not be hampered for the reason of insufficient Budget Provision & Fund Allocation. The work must be completed within the stipulated time failure of which action will be taken as per Tender Clause & PPR-2025.
5) The Procuring entity reserves the right to accept or reject any or all Tenders without assigning any reason whatsoever.

6) The concern contractor will have to arrange the required land for construction works by consulting with the local union chairman and owner of the land. The concern contractor cannot claim any additional compensation in this connection and if so; his claim will not be admissible.

7) Latest circular of BPPA and BWDB shall be implied.

8) After completion of the tender opening process, only downloaded documents of the tenderer from egp portal shall be treated as submitted documents.

9) The Contractor shall keep records of still pictures and videos of Pre-work, Ongoing work and Post work/Completion of work at his own cost.

TDS/PDS--C. Qualification Criteria--

The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least 01 (One) contract(s) of Excavation/Re-excavation of river/khal/canal/irrigation canal/irrigation canal/drainage canal/pond/wetland successfully completed within the last 05 (Five) years, each with a value of at least Tk. 470.00 Lakh. Years counting backward from the date of publication of IFT in the newspaper.

 

Note 1: For contracts under which the tenderer participated as a joint venture member or Subcontractor, only the tenderer’s share, by value, shall be considered to meet this requirement.

Note 2: Completion shall be based on the completion certificate of the completed works.

The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least 01 (One) contract(s) of Excavation/Re-excavation of river/khal/canal/irrigation canal/irrigation canal/drainage canal/pond/wetland successfully completed within the last 05 (Five) years, each with a value of at least Tk. 400.00 Lakh. Years counting backward from the date of publication of IFT in the newspaper.

 

Note 1: Completion shall be based on the completion certificate of the completed works.

TDS/PDS--C. Qualification Criteria--

The required average annual construction turnover under public sector shall be greater than Tk 665.00 Lakh of the period may be best three (3) Financial years in the last five (5) Financial years.

Note 1: Certificates from supply of goods contracts shall not be considered when calculating the average annual construction turnover.
Note 2: Financial years counting backward from the date of publication of IFT in the newspaper.

The required average annual construction turnover under public sector shall be greater than Tk 670.00 Lakh of best three (3) Financial years in the last five (5) Financial years.

Note 1: Certificates from supply of goods contracts shall not be considered when calculating the average annual construction turnover.
 

TDS/PDS--C. Qualification Criteria--

 

A Construction Project Manager, Engineer, and other key staff shall have the following qualifications and experience supported by CVs following the Form PW3-5.

No Position Total Works Experience (Years) Experience in similar works (Years)
1 Project Manager (B. Sc. in Civil Engineering) 03 02
2 Key Staff (Surveyor) 03 02

 

A Construction Project Manager, Engineer, and other key staff shall have the following qualifications and experience supported by CVs following the Form PW3-5.

No Position Total Works Experience (Years) Experience in similar works (Years)
1 Project Manager (B. Sc. in Civil Engineering) 05 03
2 Key Staff (Surveyor) 05 03
TDS/PDS--C. Qualification Criteria--

Maximum number of partners in the JV shall be 02 (Two)

 

The minimum qualification requirements of Leading Partner, other Partner(s) and requirements by summation of a JV shall be as follows:

 ITT Clauses References  Requirements by summation  Requirements for Leading Partner  Requirements for other Partner(s) 
 ITT-13.1(a) Summation not applicable Same as stated in TDS Same as for Leading Partner
 ITT-13.1(b) 100% (summation of different contracts) At least one Contract Minimum requirement not applicable
 ITT-14.1(b) 100% 40% 25%
 ITT-14.1(c) 100% 40% 25%
 ITT-14.1(d) 100% 40% 25%
 ITT-15.1 100% Minimum requirement not applicable Minimum requirement not applicable
 ITT-16.1 100% Minimum requirement not applicable Minimum requirement not applicable
 ITT-17.5 100% Maximum among the Partners Minimum 25%

The minimum qualification requirements of Leading Partner, other Partner(s) and requirements by summation of a JV shall be as follows:

 ITT Clauses References  Requirements by summation  Requirements for Leading Partner  Requirements for other Partner(s) 
 ITT-13.1(a) Summation not applicable Same as stated in TDS Same as for Leading Partner
 ITT-13.1(b) 100% (summation of different contracts) At least one Contract Minimum requirement not applicable
 ITT-14.1(b) 100% 40% 25%
 ITT-14.1(c) 100% 40% 25%
 ITT-14.1(d) 100% 40% 25%
 ITT-15.1 100% Minimum requirement not applicable Minimum requirement not applicable
 ITT-16.1 100% Minimum requirement not applicable Minimum requirement not applicable
 ITT-17.5 100% Maximum among the Partners Minimum 25%
Brief Description of Goods,Works or Service

Re-excavation of Mogra River from Km. 56.00 to Km. 61.00 = 5.00 Km in Netrokona District in c/w Resuscitation of Mogra River in Netrokona District project under Netrokona WD Division, BWDB, Netrokona during the Financial year 2025-26 & 2026-27.

Re-excavation of Mogra River from Km. 56.00 to Km. 61.00 = 5.00 Km in Netrokona District in c/w Resuscitation of Mogra River in Netrokona District project under Netrokona WD Division, BWDB, Netrokona during the Financial year 2025-26 & 2026-27.

 
Save As PDF