View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | TDS only |
| Field Name | Old Value | New Value |
|---|---|---|
| Eligibility of Consultant | A) General Instruction: |
A) General Instruction: |
| TDS/PDS--C. Qualification Criteria-- | The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least 1 (One) contract(s) of Excavation/re-excavation of River/Khal/Canal/Irrigation canal/Drainage canal/Pond/Wetland successfully completed within the last 5(Five) years, each with a value of at least Tk. 333 Lac.
[The minimum ‘number’, ‘years’ and ‘value’ stated above will depend upon the market situation, complexity, value and nature of procurement., size and type of construction work. The Procuring Entity should make its own judgement based upon its experience in the sector and construction industry. For example, it could be one (1) contract of similar nature having contract value between 50% and 80% of the official estimated cost of the current tender, during the last three (3) years or five (5) years or ten (10) years or twenty(20) years considering any specific procurement requirements (whichever appropriate but it shall be mutually exclusive from the requirement of ITT 13.1(a)); years counting backward from the date of publication of IFT in the newspaper]
[for Tenders where the package contains more than one (1) lot, this qualification requirements, only when applicable, shall be mentioned separately for each lot in the package] |
The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least 1 (One) contract(s) of Excavation/re-excavation of River/Khal/Canal/Irrigation canal/Drainage canal/Pond/Wetland successfully completed within the last 10 (Ten) years, each with a value of at least Tk. 333 Lac.
|
| TDS/PDS--C. Qualification Criteria-- | The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 3 years. [years counting backward from the date of publication of IFT in the newspaper.]
|
The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 3 years. [years counting backward from the date of publication of IFT in the newspaper.]
|
| TDS/PDS--C. Qualification Criteria-- | The required average annual construction turnover shall be greater than Tk 666 Lac over the last 5 years. [ the required average annual construction turnover is recommended to be equal to the estimated annual cash flow for the proposed Contract; however, the multiplier may vary from 1.0 to 1.5 the larger the Contract size the lesser the multiplier should be. The period may be best three (3) years in the last five (5) years or best five (5) years in the last ten (10) years (whichever appropriate in consistent with the requirement of ITT 14.1(a)); years counting backward from the date of publication of IFT in the newspaper] Example:
Estimated Contract Value: Tk 24 Cr. [for Tenders where the package contains more than one (1) lot, this qualification requirements shall be mentioned separately for each lot in the package]
[The formula for setting the AACT is as follows: |
The required average annual construction turnover shall be greater than Tk 666 Lac over the last 5 years. |
| TDS/PDS--C. Qualification Criteria-- | The minimum amount of financial resources as liquid asset or working capital or credit line(s) or specific credit commitment or in any combination of them, of the Tenderers shall be Tk 111 lac [usually the required liquid asset is the equivalent of 2-6 months payment flow at the average construction rate (straight line distribution), accessible or available after considering the financial requirements of existing commitments. The actual period will depend on the speed with which the Procuring Entity will pay the Contractor’s monthly certificate, allowing time to prepare an invoice, for the Project Manager’s time to certify it, and at least one-month contingency for preparing the cheque a making actual payment. Example:
Contract Value: Tk 24 Cr. Therefore, the minimum required liquid asset will be Tk 4 Cr., i.e. 3 months cash flow based on the above assumptions.] [for Tenders where the package contains more than one (1) lot, this qualification requirements shall be mentioned separately for each lot in the package]
|
The minimum amount of financial resources as liquid asset or working capital or credit line(s) or specific credit commitment or in any combination of them, of the Tenderers shall be Tk 111 lac |
| TDS/PDS--C. Qualification Criteria-- | The minimum capacity shall be: Tk 500 Lac The following formulae shall be used to calculate the Tender Capacity Assessed Tender Capacity = (A*N*1.25-B)
Where
A=Maximum value of Works performed in any one year during last five years N= Completion time of the proposed work in years B= Value of Existing commitments and works to be completed during the next N Years
For Tenders where the package contains more than one (1) Lot, this qualification requirement shall be mentioned separately for each lot in the package.
Note 1: In case the value of N is less than 12 (twelve) months the value of N shall be considered as 01 (one) |
The minimum capacity shall be: Tk 500 Lac |
| Brief Description of Goods,Works or Service | Re-Excavation of Nawab Khal from m 0.000 to m 5000.00 = 5000.00 m at Noyagola in Chapainawabganj Sadar Upazila in Chapainawabganj District in connection with "Waterlogging relief through excavation/re-excavation of Nawab Khal, Nayagola Khal and Railway Borrow pit in the municipal area of Chapainawabganj district" Project under Nawabganj WD Division BWDB, Chapainawabganj (Package No: RKWP-01). |
Re-Excavation of Nawab Khal from m 0.000 to m 5000.00 = 5000.00 m at Noyagola in Chapainawabganj Sadar Upazila in Chapainawabganj District in connection with "Waterlogging relief through excavation/re-excavation of Nawab Khal, Nayagola Khal and Railway Borrow pit in the municipal area of Chapainawabganj district" Project under Nawabganj WD Division BWDB, Chapainawabganj (Package No: RKWP-01). |