1. Electrical Contractor with updated ABC License, having work experience in Power Grid / BPDB / DPDC / REB / DESCO
2. A satisfactory completion of Electrical Works costs at least Tk. 05 (Five) Lacs under the maximum 01(One) of the contract over a period of the last 03 (three) years shall be required.(Years count from the date of publication IFT)
3. Contractor must have a minimum of 132 kv Circuit Breaker installation and dismantling experience in a government-owned power sector organization.
4. As stated in TDS/PCC.
132kv Circuit Breaker Dismantling, Carrying, Installation, and commissioning at Lalmonirhat grid Substation under GMD, Power Grid, Rangpur.