As Per TDS
Re-Sectioning Work along the Left Embankment of Gumti River in between KM 4.000 to KM 8.000 = 635m at Upazilla- Adarsha Sadar, District-Cumilla under Cumilla WD Division, BWDB, Cumilla during the year 2025-26.