Remaining work of "Construction of Flood Wall at Charkanai Area of Habilaishdwip Union in between Km 0.00 and Km 1.00 (Embankment Chainage from Km. 3.220 to Km. 3.830 =610.00m. & from Km. 3.865 to Km. 4.155 =290.00m.) Total = 900.00m" (120 meter Bank protection work) along the Right Bank of Boalkhali River in-connection with "Flood Control, Drainage and Irrigation Project at Patiya Upazilla in Chittagong District" at Habilaishdwip Union, Upazilla: Patiya, Dist. Chattogram under Chattogram WD Division-1, BWDB, Chattogram. (Remaining Work-FL-04)