| Field Name |
Old Value |
New Value |
| Eligibility of Consultant
|
(a) The Tenderer shall have a minimum of 3 (Three) years of General experience in the supply of Goods and related services.
(b) The minimum specific experience as Supplier in supply of Spare Parts for Fire System for Power Plant / A Large Industries at least 1 (one) contract successfully completed
within the last 3 (three) years with a value of at least Tk. 25,00,000.00 (Twenty Five Lac).
or
The minimum specific experience as Supplier in supply of Spare Parts for Fire System for Power Plant / A Large Industries at least 2 (two) contract successfully completed within the last
3 (three) years with a total value of at least Tk. 28,00,000.00 (Twenty Eight Lac).
i.e. years counting backward from the date of publication of IFT in the e-GP System.
(C) Authorization letter from Manufacturer / Authorized Distributor for the Item as specified in TDS.
|
(a) The Tenderer shall have a minimum of 3 (Three) years of General experience in the supply of Goods and related services.
(b) The minimum specific experience as Supplier in supply of Spare Parts for Fire System for Power Plant / A Large Industries at least 1 (one) contract successfully completed
within the last 3 (three) years with a value of at least Tk. 25,00,000.00 (Twenty Five Lac).
or
The minimum specific experience as Supplier in supply of Spare Parts for Fire System for Power Plant / A Large Industries at least 2 (two) contract successfully completed within the last
3 (three) years with a total value of at least Tk. 28,00,000.00 (Twenty Eight Lac).
i.e. years counting backward from the date of publication of IFT in the e-GP System.
(C) Authorization letter from Manufacturer / Authorized Distributor for the Item as specified in TDS.
|
| PCC--.--
|
For notices, the PE’s contact details shall be:
Attention: Chief Engineer
Address: Siddhirganj 2X120 MW Peaking Power Plant, EGCB Ltd., Siddhirganj, Narayanganj,
Bangladesh.
Telephone No.: 880-2-7691283
Fax No.: 880-2-7691280.
e-mail address: fazlur.rahman@egcb.com.bd
For notices, the Supplierâ??s contact details shall be:
Attention:
Address:
Telephone:
Facsimile number:
Electronic mail address:
|
For notices, the PE's contact details shall be:
Attention: Chief Engineer
Address: Siddhirganj 2X120 MW Peaking Power Plant, EGCB Ltd., Siddhirganj, Narayanganj,
Bangladesh.
Telephone No.: 880-2-7691283
Fax No.: 880-2-7691280.
e-mail address: fazlur.rahman@egcb.com.bd
For notices, the Supplier’s contact details shall be:
Attention:
Address:
Telephone:
Facsimile number:
Electronic mail address:
|
| PCC--.--
|
The scope of Supply shall be defined in: [insert â??section 6, Schedule of Supplyâ?� ] or [At the time of awarding the Contract, the PE shall specify any change in the Scope of Supply with respect to
Section 6, Schedule of supply included in the E-TD. Such changes may be due, for instance, if the quantities of goods and related Services are increased or decreased at time of award]: N/A.
|
The scope of Supply shall be defined in: [insert “section 6, Schedule of Supply” ] or [At the time of awarding the Contract, the PE shall specify any change in the Scope of Supply with respect to
Section 6, Schedule of supply included in the E-TD. Such changes may be due, for instance, if the quantities of goods and related Services are increased or decreased at time of award]: N/A.
|
| PCC--.--
|
The packing, marking and documentation within and outside the packages shall be: [insert in detail the type of packing required, the markings in the packing and all documentation required]
The packing, marking and documentation within and outside the packages shall be:
The outer packing may be clearly marked on at least four slides as follows:
Name and address of PE
Name of the Supplier
Contract Description
Final Destination/Delivery Point
Gross weight
Package number of total number of packages
Brief description of the content
Any special lifting instructions
Any special handling instructions
[Note:The above requirements should be reviewed by a PE on a case-by-case basis, with
amendments being made as necessary.]
|
The packing, marking and documentation within and outside the packages shall be: [insert in detail the type of packing required, the markings in the packing and all documentation required]
The packing, marking and documentation within and outside the packages shall be:
The outer packing may be clearly marked on at least four slides as follows:
Name and address of PE
Name of the Supplier
Contract Description
Final Destination/Delivery Point
Gross weight
Package number of total number of packages
Brief description of the content
Any special lifting instructions
Any special handling instructions
[Note:The above requirements should be reviewed by a PE on a case-by-case basis, with
amendments being made as necessary.]
|
| PCC--.--
|
The documents to be furnished by the Supplier shall be as follows:
a. Copies of Supplier’s Invoice showing good’s description, quantity, unit price, total amount;
b. Copies of Delivery Challan showing good’s description and quantity;
c. Copies of Packing List identifying contents;
d. Delivery note, railway receipt, or truck receipt;
e. Manufacturer’s / Supplier’s Guarantee/Warranty Certificate stating quality, quantity, genuineness of goods supplied and the validity of warranty period;
f. The supplier have to provide declaration that the product are new and unused supported with relevent document.
g. Manufacturer’s Quality Test Report;
h. Certificate of Country of origin.
|
The documents to be furnished by the Supplier shall be as follows:
a. Copies of Supplier's Invoice showing good's description, quantity, unit price, total amount;
b. Copies of Delivery Challan showing good's description and quantity;
c. Copies of Packing List identifying contents;
d. Delivery note, railway receipt, or truck receipt;
e. Manufacturer's / Supplier's Guarantee/Warranty Certificate stating quality, quantity, genuineness of goods supplied and the validity of warranty period;
f. The supplier have to provide declaration that the product are new and unused supported with relevent document.
g. Manufacturer's Quality Test Report;
h. Certificate of Country of origin.
|
| PCC--.--
|
The payment-delay period after which the PE shall pay interest to the supplier shall be [Indicate the days] days after submission of an invoice or request for payment by the Supplier, and after the PE has accepted it: N/A.
|
The payment-delay period after which the PE shall pay interest to the supplier shall be [Indicate the days] days after submission of an invoice or request for payment by the Supplier, and after the PE has accepted it: N/A.
|
| PCC--.--
|
The method and conditions of payment to be made to the Supplier under this Contract shall be as
follows:
(a) Advance Payment: Not Applicable.
(b) Payment shall be made in BDT through A/c Payee cheque in favour of supplier’s Bank A/c in the following manner:
i) On Delivery & R&I : Ninety percent (90%) of the Price of the delivered Goods and related services shall be paid upon submission of documents specified in GCC Clause 23.1 supported by
the Receiving cum Inspection (R&I) Report issued (after satisfactory functionality test of delivered goods inserting in the existing system) by the consignee.
ii) On Issuance of FAC: Payment of rest Ten percent (10%) of Goods delivered shall be made after warranty period against Final Acceptance Certificate (FAC) issued by the consignee after the expiry of warranty period.
Note 1: All bills shall be certified by the concerned Executive Engineer and counter signed by Superintending Engineer (Maintenance) and Chief Engineer for payment.
Note 2: VAT & AIT on payable amount shall be deducted from the bill as per prevailing rules and regulations of GOB.
|
The method and conditions of payment to be made to the Supplier under this Contract shall be as
follows:
(a) Advance Payment: Not Applicable.
(b) Payment shall be made in BDT through A/c Payee cheque in favour of supplier's Bank A/c in the following manner:
i) On Delivery & R&I : Ninety percent (90%) of the Price of the delivered Goods and related services shall be paid upon submission of documents specified in GCC Clause 23.1 supported by
the Receiving cum Inspection (R&I) Report issued (after satisfactory functionality test of delivered goods inserting in the existing system) by the consignee.
ii) On Issuance of FAC: Payment of rest Ten percent (10%) of Goods delivered shall be made after warranty period against Final Acceptance Certificate (FAC) issued by the consignee after the expiry of warranty period.
Note 1: All bills shall be certified by the concerned Executive Engineer and counter signed by Superintending Engineer (Maintenance) and Chief Engineer for payment.
Note 2: VAT & AIT on payable amount shall be deducted from the bill as per prevailing rules and regulations of GOB.
|
| PCC--.--
|
The inspections and tests shall be :
a) Post Landing Inspection shall be done after arrival of Goods at Siddhirganj 2X120 MW Peaking Power Plant Ware House. Post Landing Inspection shall be conducted by EGCB’s representative
(Post Landing Inspection Committee) in presence of supplier’s representative. The program of such inspection shall be intimated to the representative of supplier by EGCB upon arrival of the Goods
at Siddhirganj 2X120 MW Peaking Power Plant Ware House.
b) The Procuring Entity has the right to inspect, test and where necessary, reject the Goods arrived at store shall in no way be limited or waived by reason of the Goods having previously been tested
and passed by the manufacturer/supplier.
c) Nothing in this clause shall in any way release the supplier from any warranty or other obligation under the provisions of the contract
|
The inspections and tests shall be :
a) Post Landing Inspection shall be done after arrival of Goods at Siddhirganj 2X120 MW Peaking Power Plant Ware House. Post Landing Inspection shall be conducted by EGCB's representative
(Post Landing Inspection Committee) in presence of supplier's representative. The program of such inspection shall be intimated to the representative of supplier by EGCB upon arrival of the Goods
at Siddhirganj 2X120 MW Peaking Power Plant Ware House.
b) The Procuring Entity has the right to inspect, test and where necessary, reject the Goods arrived at store shall in no way be limited or waived by reason of the Goods having previously been tested
and passed by the manufacturer/supplier.
c) Nothing in this clause shall in any way release the supplier from any warranty or other obligation under the provisions of the contract
|
| PCC--.--
|
The period of validity of the Warranty shall be : Twelve (12) months from the date of Issuance of Receiving cum Inspection (R&I) Report by the consignee.
|
The period of validity of the Warranty shall be : Twelve (12) months from the date of Issuance of Receiving cum Inspection (R&I) Report by the consignee.
|
| PCC--.--
|
The Supplier shall correct any defects covered by the Warranty within 21 (twenty one) days of being notified by the PE of the occurrence of such defects.
|
The Supplier shall correct any defects covered by the Warranty within 21 (twenty one) days of being notified by the PE of the occurrence of such defects.
|
| PCC--.--
|
Liquidated Damage: The amount of Liquidated Damages is Zero point one percent (0.1%) of the contract value of the undelivered Goods or any part thereof delivered after expiry of the Delivery and Completion Schedule or extended Delivery and Completion Schedule, as applicable, per day of delay.
Guide to application of GCC Sub Clause 35.1 above [ Liquidated damages is equivalent to an amount to be determined in accordance with the following formulae:
T = V x P x n
Where;
T = Total amount of Liquidated Damages
V = Contract Value of undelivered Goods or any part thereof, delivered after expiry of the Delivery
and Completion Schedule or extended Delivery and Completion Schedule, as applicable
P = Percent-rate at which the Liquidated Damages shall be imposed per day of delay
n = No of days delayed for delivery of the undelivered Goods or any part thereof, after expiry of the Delivery and Completion Schedule or extended Delivery and Completion Schedule, as applicable.
The maximum amount of Liquidated Damages for the undelivered Goods or any part thereof is Ten percent (10%) of the final Contract Price of the whole of the Goods and related service.
|
Liquidated Damage: The amount of Liquidated Damages is Zero point one percent (0.1%) of the contract value of the undelivered Goods or any part thereof delivered after expiry of the Delivery and Completion Schedule or extended Delivery and Completion Schedule, as applicable, per day of delay.
Guide to application of GCC Sub Clause 35.1 above [ Liquidated damages is equivalent to an amount to be determined in accordance with the following formulae:
T = V x P x n
Where;
T = Total amount of Liquidated Damages
V = Contract Value of undelivered Goods or any part thereof, delivered after expiry of the Delivery
and Completion Schedule or extended Delivery and Completion Schedule, as applicable
P = Percent-rate at which the Liquidated Damages shall be imposed per day of delay
n = No of days delayed for delivery of the undelivered Goods or any part thereof, after expiry of the Delivery and Completion Schedule or extended Delivery and Completion Schedule, as applicable.
The maximum amount of Liquidated Damages for the undelivered Goods or any part thereof is Ten percent (10%) of the final Contract Price of the whole of the Goods and related service.
|
| PCC--.--
|
The Adjudicator jointly appointed by the Parties is:
In case of disagreement between the parties, the Appointing Authority for the Adjudicator is the President of the Institution of Engineers, Bangladesh.
|
The Adjudicator jointly appointed by the Parties is:
In case of disagreement between the parties, the Appointing Authority for the Adjudicator is the President of the Institution of Engineers, Bangladesh.
|
| PCC--.--
|
Arbitration shall take place in: Narayanganj, Bangladesh or Dhaka, Bangladesh.
|
Arbitration shall take place in: Narayanganj, Bangladesh or Dhaka, Bangladesh.
|
| TDS/PDS--A. General--
|
The PE is : Electricity Generation Company of Bangladesh (EGCB) Limited.
Consignee:
Chief Engineer,
Siddhirganj 2x120 MW Peaking Power Plant, EGCB Ltd., Siddhirganj,
Narayanganj, Bangladesh.
The Name and identification number of Tender are : 27.27.6758.207.03.001.17.1858, Date: 25.09.17
The number, identification and name of lots comprising the Tender are: N/A.
|
The PE is : Electricity Generation Company of Bangladesh (EGCB) Limited.
Consignee:
Chief Engineer,
Siddhirganj 2x120 MW Peaking Power Plant, EGCB Ltd., Siddhirganj,
Narayanganj, Bangladesh.
The Name and identification number of Tender are : 27.27.6758.207.03.001.17.1858, Date: 25.09.17
The number, identification and name of lots comprising the Tender are: N/A.
|
| TDS/PDS--B. e-Tender Document--
|
Allowed to post clarification till [Date and Time]: As per tender notice.
|
Allowed to post clarification till [Date and Time]: As per tender notice.
|
| TDS/PDS--B. e-Tender Document--
|
Pre- Tender meeting [Date & Time]: 02-Oct-2017 10:30 Hr to 25-Oct-2017 16:00 Hr.
|
Pre- Tender meeting [Date & Time]: 02-Oct-2017 10:30 Hr to 25-Oct-2017 16:00 Hr.
|
| TDS/PDS--B. e-Tender Document--
|
The Pre- Tender meeting shall be held through e-GP System.
|
The Pre- Tender meeting shall be held through e-GP System.
|
| TDS/PDS--C. Qualification Criteria--
|
The Tenderer shall have a minimum of [state number] years of General experience in the supply of Goods and related services.
(a) The Tenderer shall have a minimum of 3 (Three) years of General experience in the supply of Goods and related services.
(b) The minimum specific experience as Supplier in supply of Spare Parts for Fire System for Power Plant / A Large Industries at least 1 (one) contract successfully completed
within the last 3 (three) years with a value of at least Tk. 25,00,000.00 (Twenty Five Lac).
or
The minimum specific experience as Supplier in supply of Spare Parts for Fire System for Power Plant / A Large Industries at least 2 (two) contract successfully completed within the last
3 (three) years with a total value of at least Tk. 28,00,000.00 (Twenty Eight Lac).
i.e. years counting backward from the date of publication of IFT in the e-GP System.
|
The Tenderer shall have a minimum of [state number] years of General experience in the supply of Goods and related services.
(a) The Tenderer shall have a minimum of 3 (Three) years of General experience in the supply of Goods and related services.
(b) The minimum specific experience as Supplier in supply of Spare Parts for Fire System for Power Plant / A Large Industries at least 1 (one) contract successfully completed
within the last 3 (three) years with a value of at least Tk. 25,00,000.00 (Twenty Five Lac).
or
The minimum specific experience as Supplier in supply of Spare Parts for Fire System for Power Plant / A Large Industries at least 2 (two) contract successfully completed within the last
3 (three) years with a total value of at least Tk. 28,00,000.00 (Twenty Eight Lac).
i.e. years counting backward from the date of publication of IFT in the e-GP System.
|
| TDS/PDS--C. Qualification Criteria--
|
The minimum amount of liquid asset Tk. 28,00,000.00 (Twenty Eight Lakh Taka) Only.
|
The minimum amount of liquid asset Tk. 28,00,000.00 (Twenty Eight Lakh Taka) Only.
|
| TDS/PDS--D. Tender Preparation--
|
The Tenderer shall submit with its e-Tender the following additional documents:
a) Updated Trade License.
b) Updated Income Tax Certificate.
c) Updated VAT registration certificate.
d) Work completion certificate for supply of Spare Parts for Fire System for Power Plant / A Large Industries at least 1 (one) contract successfully completed within the last 3 (three) years
with a value of at least Tk. 25,00,000.00 (Twenty Five Lac).
or
Work completion certificate for supply of Spare Parts for Fire System for Power Plant / A Large Industries at least 2 (two) contract successfully completed within the last 3 (three) years with a total value of at least Tk. 28,00,000.00 (Twenty Eight Lac). Notifcation of Award (NOA) will not be accepted.
e) Authorization letter from Manufacturer / Authorized Distributor for Item no 02 & 03 as specified in Price and Delivery Schedule for Goods (Form e-PG3-3A).
f) Catalogue of the product from the manufacturer / Authorized Distributor.
Supporting documents must be submitted by the tenderer. Otherwise tender will be considered as non-responsive.
|
The Tenderer shall submit with its e-Tender the following additional documents:
a) Updated Trade License.
b) Updated Income Tax Certificate.
c) Updated VAT registration certificate.
d) Work completion certificate for supply of Spare Parts for Fire System for Power Plant / A Large Industries at least 1 (one) contract successfully completed within the last 3 (three) years
with a value of at least Tk. 25,00,000.00 (Twenty Five Lac).
or
Work completion certificate for supply of Spare Parts for Fire System for Power Plant / A Large Industries at least 2 (two) contract successfully completed within the last 3 (three) years with a total value of at least Tk. 28,00,000.00 (Twenty Eight Lac). Notifcation of Award (NOA) will not be accepted.
e) Authorization letter from Manufacturer / Authorized Distributor for Item no 02 & 03 as specified in Price and Delivery Schedule for Goods (Form e-PG3-3A).
f) Catalogue of the product from the manufacturer / Authorized Distributor.
Supporting documents must be submitted by the tenderer. Otherwise tender will be considered as non-responsive.
|
| TDS/PDS--D. Tender Preparation--
|
Manufacturer authorization is: Required.
A Manufacturer Authorisation Letter is only required for [the following items listed in the Price and Delivery schedule for Goods and related Service.] item no 02 & 03.
Distributor’s Authorization Letter is also acceptable. In that case, Manufacturer’s Authorization against Distributor is required.
|
Manufacturer authorization is: Required.
A Manufacturer Authorisation Letter is only required for [the following items listed in the Price and Delivery schedule for Goods and related Service.] item no 02 & 03.
Distributor's Authorization Letter is also acceptable. In that case, Manufacturer's Authorization against Distributor is required.
|
| TDS/PDS--D. Tender Preparation--
|
After sales service is: â?? not requiredâ?�
|
After sales service is: “ not required”
|
| TDS/PDS--E. Tender Submission--
|
The deadline for lodgement of e-Tenders is 26 October, 2017 11:30 Hr.
|
The deadline for lodgement of e-Tenders is 26 October, 2017 11:30 Hr.
|
| TDS/PDS--G. Contract Award--
|
The maximum percentage by which quantities per item may be increased is 15 % (Fifteen) Percentage.
|
The maximum percentage by which quantities per item may be increased is 15 % (Fifteen) Percentage.
|
| TDS/PDS--G. Contract Award--
|
The amount of Performance Security shall be 10 (ten) percent of the Contract Price.
|
The amount of Performance Security shall be 10 (ten) percent of the Contract Price.
|
| Brief Description of Goods,Works or Service
|
Purchase of Spares for Ultra Violet (UV) Flame Detection System, Combustible Gas Detection System and Fire Detection System, Portable Gas Detector for Gas Leaks detection and Portable Multi Gas Analyzer for Combustion & Emission Testing & others I&C Spares for Siddhirganj 2x120 MW Peaking Power Plant, EGCB Ltd., Siddhirganj, Narayanganj, Bangladesh.
|
Purchase of Spares for Ultra Violet (UV) Flame Detection System, Combustible Gas Detection System and Fire Detection System, Portable Gas Detector for Gas Leaks detection and Portable Multi Gas Analyzer for Combustion & Emission Testing & others I&C Spares for Siddhirganj 2x120 MW Peaking Power Plant, EGCB Ltd., Siddhirganj, Narayanganj, Bangladesh.
|