| PCC 31. Inspections and Tests31.1 Inspections and Tests
|
| Goods | Type of test | Time or milestone | Place | Procedure | | 200 mm (DN200) SCADA Compatible Bulk Water Meter as per specification | Pre-shipment Inspection & Test | Prior to shipment of the goods | Manufacturer Factory premises | i)Prior to shipment, the supplier shall be submitted a list of 3 (three) recognized International Inspection Agencies or Licensed Testing Agents for approval by the Procuring Entity (PE). The approved agent will conduct Pre-shipment inspection and check the compliance of meters with the specifications set forth in this document and country of origin of the meters. Supplier shall be submitted the inspection report to Procuring Entity (PE). If the report is not satisfactory the contract will be terminated. If the inspection report is satisfactory, supplier shall be arranged training program on operation, maintenance and troubleshooting for 3(three) DWASA Officials at manufacturer factory/premises. ii) Test & Inspection after delivery: After delivery of the meters at the final destination the physical inspection shall be held jointly by a committee of DWASA. If the physical inspection is not satisfactory, the supplier shall have to take back unaccepted / rejected meters at his expense within 15 (Fifteen) days from the day of issuance of the letter from Procuring Entity (PE). The unaccepted / rejected meters shall be corrected or replaced by new goods as per specification which will be inspected accordingly | | 200 mm (DN200) SCADA Compatible Bulk Water Meter as per specification | Physical inspection & testing | After completion of delivery of goods to the final destination | Physical inspection shall be performed at Dhaka WASA'S Centre store and tests will be performed at BUET/MIST/DWASA meter testing lab or equivalent test laboratory in Bangladesh | If physical inspection is found satisfactory, inspection committee shall be select 2 (two) numbers of meter randomly from supplied meters and selected meters shall be sent to BUET/MIST/DWASA meter testing lab or equivalent test laboratory in Bangladesh for testing the accuracy of the meter flow. If the test results are found satisfactory in accordance with the specifications, then the supplied meters shall be accepted. The Procuring Entity (PE) right to inspect, test and where appropriate reject the meters after delivery, shall in no way be limited or waived by the reason of meters having previously been inspected, tested or passed by the Procuring Entity (PE) or its representative prior meters shipment. All expenses related to the inspection, tests and training in Bangladesh or abroad shall have to be borne by the supplier. | |
| Goods | Type of test | Time or milestone | Place | Procedure | | 200 mm (DN200) SCADA Compatible Bulk Water Meter as per specification | Pre-shipment Inspection & Test | Prior to shipment of the goods | Manufacturer Factory premises | i)Prior to shipment, the supplier shall be submitted a list of 3 (three) recognized International Inspection Agencies or Licensed Testing Agents for approval by the Procuring Entity (PE). The approved agent will conduct Pre-shipment inspection and check the compliance of meters with the specifications set forth in this document and country of origin of the meters. Supplier shall be submitted the inspection report to Procuring Entity (PE). If the report is not satisfactory the contract will be terminated. If required, supplier shall be arranged training program on operation, maintenance and troubleshooting for 3(three) DWASA Officials at manufacturer factory/premises. ii) Test & Inspection after delivery: After delivery of the meters at the final destination the physical inspection shall be held jointly by a committee of DWASA. If the physical inspection is not satisfactory, the supplier shall have to take back unaccepted / rejected meters at his expense within 15 (Fifteen) days from the day of issuance of the letter from Procuring Entity (PE). The unaccepted / rejected meters shall be corrected or replaced by new goods as per specification which will be inspected accordingly | | 200 mm (DN200) SCADA Compatible Bulk Water Meter as per specification | Physical inspection & testing | After completion of delivery of goods to the final destination | Physical inspection shall be performed at Dhaka WASA'S Centre store and tests will be performed at BUET/MIST/DWASA meter testing lab or equivalent test laboratory in Bangladesh | If physical inspection is found satisfactory, inspection committee shall be select 2 (two) numbers of meter randomly from supplied meters and selected meters shall be sent to BUET/MIST/DWASA meter testing lab or equivalent test laboratory in Bangladesh for testing the accuracy of the meter flow. If the test results are found satisfactory in accordance with the specifications, then the supplied meters shall be accepted. The Procuring Entity (PE) right to inspect, test and where appropriate reject the meters after delivery, shall in no way be limited or waived by the reason of meters having previously been inspected, tested or passed by the Procuring Entity (PE) or its representative prior meters shipment. All expenses related to the inspection, tests and training in Bangladesh or abroad shall have to be borne by the supplier. | |